Extron electronic 305SA manual Screw the adjuster plate onto the base of the pipe

Page 17

d.Using a 3/32 inch hex wrench, back out the set screws on the top portion of the adjuster

plate (see A in the image below) of the UPB 25. Screw the plate onto the base of the pipe. Align it so the security flange is at the rear

a

Set Screws (2)

 

Adjuster

Loosen the four Adjuster Plate

Plate

Locking Screws and slide the

 

Adjuster Plate away from the

 

Projector Bracket

 

Projectorb

 

Bracket

Security flange

 

 

Adjuster Plate

 

Locking Screws (4)

ÏScrew the adjuster plate onto the base of the pipe.

e.Carefully follow the steps below to install the projector bracket on the projector.

i.Invert the projector on a flat surface to access the mounting points. Use a blanket or a similar item under the projector to protect the projector and the surface.

ii.On each arm, rotate the barrel (on the end of the arm) so that it only just protrudes from the base of the arm (see the figure at right).

iii.Select the correct sized mounting screws and the appropriately sized washers that fit the projector mounting point inserts.

iv.To attach the arms to the projector:

The next step is critical as it provides a flat surface for the bracket to sit on, and must be done for each mounting point.

Place a washer on a mounting point (see

the figure at right).

Position the arm so the barrel is over the

washer.

Insert the mounting screw down through the

barrel and washer, and into the threaded insert

(mounting point). Lightly tighten the screw by

hand.

NOTE: If using the 3- or 4-millimeter

screws, place an additional small washer

under each screw head, on top of the

barrel, as well as one on the top of the

mounting point.

v. Repeat step iv for all projector mounting

points.

Rotate the barrel

ii until it just protrudes below the arm.

ATTENTION:

iv

Ü

Place washer on

mounting point.

Mounting Point

on Projector Base

This is critical as it provides a flat surface for the bracket to sit on.

Place the washer Align the barrel Insert the screw

PoleVault IP Systems • Installation — Stage 1 (Screen and Projector)

13

Image 17
Contents PoleVault IP Systems Sicherheitsanweisungen Deutsch Safety InstructionsGuide on the Extron website FCC Class B NoticeConventions Used in this Guide Specifications AvailabilityLetter o Variables are written in slanted form as shown herePoleVault IP System OverviewPoleVault IP System Installation and Wiring Overview Typical Classroom Installation Before You Begin Planning the InstallationLocation of the Screen and Projector Location of MediaLink Controller and Wall Plates Included Items InventorySee rear cover for contact numbers KitsItems Not Included Installation Overview Outline of Installation Steps Stage Installing the Screen Projector Mark Screen Location Install Projector to Verify LocationMark the screen location Place the PCM 340 on the T-barScrew the adjuster plate onto the base of the pipe Closest to the barrel on each arm, place Using the slots on the bracket that areViii. Evenly balanced configuration Verify the Image Location Slide and lock the projector onto the adjuster plateMark the structural ceiling for lag eye bolt installation Preliminary Safety Hardware InstallationCut the Ceiling Tile Take the measurements with the PCM 340 on the T-frameFinish Projector Drop Ceiling Mount Installation Hand tighten all four turnbuckles Secure the Projector Drop Ceiling Mount to the CeilingAttach the turnbuckles at the corners of the PCM Shock or serious injury. For safety Install the Electrical Box if requiredInstall the Raco box and plaster ring onto the PCM Install the ScreenPage PVT CV D and PVT RGB D IP Plus AV Source Input Wallplates MLC 104 IP Plus installation PVT transmitter installationMLS 104 IP Plus MediaLink Controller Cabling for the Wallplates and MediaLink ControllerInsert the PVT mud ring into the wall Install the Mud RingsFeatures for MLC Mud Ring Installation Pull the cables at each location Signal Cable Label colorProvide strain relief Install Wall Plates Connect the MLC 104 IP Plus to the switcher Install MediaLink ControllerTerminal RS-232 Cable color Pin Connect to the LAN using a CAT 5 cableTCP/IP Connections made to the MLC 104 IP PlusSpeaker Installation Stage 3 Involves Installing the Devices Shown BelowFF 120 Flat Field Ceiling Speakers Cabling for the SpeakersMark and cut the tile Install the Speaker on the Drop CeilingCut Ceiling Tile Attach safety cable Wire the captive screw connector Terminate the Speaker Cable for the PVS SwitcherStereo or dual mono output using parallel speaker wiring Stereo output Dual mono outputStage 4 Involves Installing the Devices Shown Below PVS 305SA IP PoleVault SwitcherPMK 550 Pole Mount Kit Rear ViewInstall the PMK 550 Base Plate Gather the cables, pass them down the pipe Pull the Cables at the Switcher locationSwitcher and Projector Cable Overview Your completed connections should look like the image below Finish installing the Pole Mount KitConfigure the Switcher MLS Switcher Configuration Program Stage 5 Involves Installing the Programs Shown BelowConfigurator Configure the System GlobalTest the System Check that an image is present, and adjust as neededAdjust the audio levels on the PVS 305SA IP Test the MLC configuration is correctFinal Installation Any changes to the Edid settings as needed Using Preset ModeWhen the image is correct, re-install the wallplate Preset Switch setting Resolution NumberOn the rear panel, set all the DIP switches to off down Using Learn Mode Available on PVT RGB D Plus onlyVoiceLift System Included parts Optional Accessory Installation VoiceLift SystemInstallation Procedure Priority Page Sensor Kit Included Parts Optional Accessory Installation Priority Page Sensor KitPoleVault Switchers PVS, available at Configuration program for MLSTesting and Adjustment Procedure Typical paging system with PVS 305SA IP switcherExtron Warranty Outline of Installation Steps