1. — Mark Screen Location

TIPS:

When marking the location of screens, devices, or the site for installing transmitters and MediaLink control devices, use painters tape to avoid wall surface damage.

When marking the center line of the screen, where possible, keep it aligned with the center of the ceiling tile. This makes the projector installation and alignment easier.

a.Mark the center line and the outer edges of the screen.

b.Mark any structural studs, utility pipes, conduits, or fire breaks before drilling the hardware holes. Do not drill the holes yet.

ÄMark the screen location.

2. — Install Projector to Verify Location

a. Remove the ceiling tiles at the location, and

mark the maximum and minimum throw

distances on the T-frame.See the projector

installation manual for more information.

TIP: For ease of working on the T-frame

remove the adjacent tiles.

b. Place the PCM 340 over the T-frame, between

the two marks. Lightly tighten the T-frame

securing screws. The T-frame screws can be

used on the outside or the inside to secure the

PCM to the T-frame.

NOTE: Place the PCM 340 on the T-frame

so that the pipe adapter slides left to right

in relation to the proposed screen location,

rather than towards and away from it. This

makes it easier to align and center the

image.

c. Slide the slotted pipe up into the pipe adapter.

Adjust to the desired height and align the

location holes and pipe holes. Insert the location

screw, lightly tightening it down using a

5/32 inch hex wrench. Insert and lightly tighten

down the set screws onto the pipe. Do not

overtighten. The pipe is removed and replaced

later during installation.

Minimum/Maximum

Throw Distance Marks

PCM 340

ÉPlace the PCM 340 on the T-bar

Slotted

Pipe

Pipe

Adapter

Align Pipe holes with location screw holes.

Insert location screw and secure.

ÎInsert and secure the slotted pipe.

12PoleVault IP Systems • Installation — Stage 1 (Screen and Projector)

Image 16
Contents PoleVault IP Systems Safety Instructions Sicherheitsanweisungen DeutschFCC Class B Notice Guide on the Extron websiteSpecifications Availability Conventions Used in this GuideLetter o Variables are written in slanted form as shown hereOverview PoleVault IP SystemPoleVault IP System Installation and Wiring Overview Before You Begin Planning the Installation Typical Classroom InstallationLocation of the Screen and Projector Location of MediaLink Controller and Wall Plates Inventory Included ItemsKits See rear cover for contact numbersItems Not Included Installation Overview Outline of Installation Steps Stage Installing the Screen Projector Install Projector to Verify Location Mark Screen LocationMark the screen location Place the PCM 340 on the T-barScrew the adjuster plate onto the base of the pipe Viii. Evenly balanced configuration Using the slots on the bracket that areClosest to the barrel on each arm, place Slide and lock the projector onto the adjuster plate Verify the Image LocationPreliminary Safety Hardware Installation Mark the structural ceiling for lag eye bolt installationCut the Ceiling Tile Take the measurements with the PCM 340 on the T-frameFinish Projector Drop Ceiling Mount Installation Attach the turnbuckles at the corners of the PCM Secure the Projector Drop Ceiling Mount to the CeilingHand tighten all four turnbuckles Install the Electrical Box if required Shock or serious injury. For safetyInstall the Raco box and plaster ring onto the PCM Install the ScreenPage PVT CV D and PVT RGB D IP Plus AV Source Input Wallplates PVT transmitter installation MLC 104 IP Plus installationMLS 104 IP Plus MediaLink Controller Cabling for the Wallplates and MediaLink ControllerFeatures for MLC Mud Ring Installation Install the Mud RingsInsert the PVT mud ring into the wall Provide strain relief Signal Cable Label colorPull the cables at each location Install Wall Plates Install MediaLink Controller Connect the MLC 104 IP Plus to the switcherConnect to the LAN using a CAT 5 cable Terminal RS-232 Cable color PinConnections made to the MLC 104 IP Plus TCP/IPStage 3 Involves Installing the Devices Shown Below Speaker InstallationFF 120 Flat Field Ceiling Speakers Cabling for the SpeakersCut Ceiling Tile Install the Speaker on the Drop CeilingMark and cut the tile Attach safety cable Terminate the Speaker Cable for the PVS Switcher Wire the captive screw connectorStereo or dual mono output using parallel speaker wiring Stereo output Dual mono outputPVS 305SA IP PoleVault Switcher Stage 4 Involves Installing the Devices Shown BelowPMK 550 Pole Mount Kit Rear ViewInstall the PMK 550 Base Plate Switcher and Projector Cable Overview Pull the Cables at the Switcher locationGather the cables, pass them down the pipe Finish installing the Pole Mount Kit Your completed connections should look like the image belowStage 5 Involves Installing the Programs Shown Below Configure the Switcher MLS Switcher Configuration ProgramConfigure the System Global ConfiguratorCheck that an image is present, and adjust as needed Test the SystemTest the MLC configuration is correct Adjust the audio levels on the PVS 305SA IPFinal Installation Using Preset Mode Any changes to the Edid settings as neededWhen the image is correct, re-install the wallplate Preset Switch setting Resolution NumberUsing Learn Mode Available on PVT RGB D Plus only On the rear panel, set all the DIP switches to off downInstallation Procedure Optional Accessory Installation VoiceLift SystemVoiceLift System Included parts Optional Accessory Installation Priority Page Sensor Kit Priority Page Sensor Kit Included PartsConfiguration program for MLS PoleVault Switchers PVS, available atTesting and Adjustment Procedure Typical paging system with PVS 305SA IP switcherExtron Warranty Outline of Installation Steps