Extron electronic 305SA manual MLS 104 IP Plus MediaLink Controller, PVT transmitter installation

Page 26

MLS 104 IP Plus MediaLink Controller

Mounting screws (4)

Captive screw connectors for:

Display/RS-232/IR

Comm. Link

Digital I/O,

MLS/RS-232

Power

DISPLAY

ON

OFF

VOLUME

CONFIG

VCR

DVD

PC

1

2

3

4

RS-

 

 

Tx

 

 

 

 

 

 

Rx

 

 

RUN

 

DISPLAY

GROUND

 

 

100

 

 

 

 

 

IR OUT

 

 

 

 

232/IR

 

 

 

 

Location of

A+12V OUT

 

 

 

BGROUND

 

 

 

COMM

 

 

CM

 

Ethernet

-00

MAC address

CD

IR IN

 

LINK

 

SCP

 

 

05

 

E

LAN

port

-A6-

 

 

 

 

 

1

 

 

I/O

 

 

2

PRESS TAB WITH TWEEKEROVTO REM

 

01-6B-F5

 

 

 

3

 

 

DIGITAL

 

 

 

 

 

GROUND

 

 

RS-

 

A B

Rx

 

 

 

 

 

 

MLS

Tx

 

 

232

 

 

 

 

 

GROUND

E

 

 

 

12V

 

GROUND

 

 

 

 

POWER

+12V IN

 

 

 

 

MLC 104 IP PLUS

Right Side

 

Rear View

 

 

 

 

 

Where it goes: Installs in a wall at a location convenient to user.

What it does: Provides remote control of switcher and projector.

Cabling for the Wallplates and MediaLink Controller

PVT transmitter installation

CAT 5 T568A signal transmission cables (connects PVT input wallplates to PVS 305SA IP switcher)

MLC 104 IP Plus installation

MLC power and RS-232 control cable (connects the MLC controller to the MLC/Power control port on the PVS 305SA IP switcher)

IR/RS-232 communications cable control cable (connects the MLC controller to the projector via

RS-232 or to an IR emitter)

LAN network cables (not supplied - connects the MLC controller to LAN)

CAT 5 Patch, 50 ft 26-637-50

MLC, PW/RS-232/VC, 50 ft 26-626-50

IR SERIAL COMM, 50 ft 26-621-50

22PoleVault IP Systems • Installation — Stage 2 (Wallplates and MLC)

Image 26
Contents PoleVault IP Systems Safety Instructions Sicherheitsanweisungen DeutschFCC Class B Notice Guide on the Extron websiteLetter o Specifications AvailabilityConventions Used in this Guide Variables are written in slanted form as shown hereOverview PoleVault IP SystemPoleVault IP System Installation and Wiring Overview Before You Begin Planning the Installation Typical Classroom InstallationLocation of the Screen and Projector Location of MediaLink Controller and Wall Plates Inventory Included ItemsKits See rear cover for contact numbersItems Not Included Installation Overview Outline of Installation Steps Stage Installing the Screen Projector Mark the screen location Install Projector to Verify LocationMark Screen Location Place the PCM 340 on the T-barScrew the adjuster plate onto the base of the pipe Closest to the barrel on each arm, place Using the slots on the bracket that areViii. Evenly balanced configuration Slide and lock the projector onto the adjuster plate Verify the Image LocationCut the Ceiling Tile Preliminary Safety Hardware InstallationMark the structural ceiling for lag eye bolt installation Take the measurements with the PCM 340 on the T-frameFinish Projector Drop Ceiling Mount Installation Hand tighten all four turnbuckles Secure the Projector Drop Ceiling Mount to the CeilingAttach the turnbuckles at the corners of the PCM Install the Raco box and plaster ring onto the PCM Install the Electrical Box if requiredShock or serious injury. For safety Install the ScreenPage PVT CV D and PVT RGB D IP Plus AV Source Input Wallplates MLS 104 IP Plus MediaLink Controller PVT transmitter installationMLC 104 IP Plus installation Cabling for the Wallplates and MediaLink ControllerInsert the PVT mud ring into the wall Install the Mud RingsFeatures for MLC Mud Ring Installation Pull the cables at each location Signal Cable Label colorProvide strain relief Install Wall Plates Install MediaLink Controller Connect the MLC 104 IP Plus to the switcherConnect to the LAN using a CAT 5 cable Terminal RS-232 Cable color PinConnections made to the MLC 104 IP Plus TCP/IPFF 120 Flat Field Ceiling Speakers Stage 3 Involves Installing the Devices Shown BelowSpeaker Installation Cabling for the SpeakersMark and cut the tile Install the Speaker on the Drop CeilingCut Ceiling Tile Attach safety cable Stereo or dual mono output using parallel speaker wiring Terminate the Speaker Cable for the PVS SwitcherWire the captive screw connector Stereo output Dual mono outputPMK 550 Pole Mount Kit PVS 305SA IP PoleVault SwitcherStage 4 Involves Installing the Devices Shown Below Rear ViewInstall the PMK 550 Base Plate Gather the cables, pass them down the pipe Pull the Cables at the Switcher locationSwitcher and Projector Cable Overview Finish installing the Pole Mount Kit Your completed connections should look like the image belowStage 5 Involves Installing the Programs Shown Below Configure the Switcher MLS Switcher Configuration ProgramConfigure the System Global ConfiguratorCheck that an image is present, and adjust as needed Test the SystemTest the MLC configuration is correct Adjust the audio levels on the PVS 305SA IPFinal Installation When the image is correct, re-install the wallplate Using Preset ModeAny changes to the Edid settings as needed Preset Switch setting Resolution NumberUsing Learn Mode Available on PVT RGB D Plus only On the rear panel, set all the DIP switches to off downVoiceLift System Included parts Optional Accessory Installation VoiceLift SystemInstallation Procedure Optional Accessory Installation Priority Page Sensor Kit Priority Page Sensor Kit Included PartsTesting and Adjustment Procedure Configuration program for MLSPoleVault Switchers PVS, available at Typical paging system with PVS 305SA IP switcherExtron Warranty Outline of Installation Steps