Extron electronic 305SA manual Slide and lock the projector onto the adjuster plate

Page 19

ix.Check for stress on the arms. To do this loosen the mounting screws (do not remove). If the arm or the barrel lifts, this indicates stress on the arm. Adjust the height of the threaded barrels to reduce or eliminate

any torque or stress that might be caused by crossed arms or by projector mounting points with differing heights. It is important to keep the arms level and as close (low) to the projector base as possible.

x.Check that the projector weight is still as evenly distributed as possible.

Hand tighten the screws until snug.

ATTENTION: Do not overtighten the mounting screws as this may damage the projector. See the projector manual for the threaded insert torque setting.

f.Lift the projector up to the adjuster plate and slide it into place. Tighten down the locking and pivot screws.

Loosen the screw and adjust

the barrel height to reduce torque on the arms and bracket.

Tighten down all the mounting screws.

Washer

INCORRECT

CORRECT

Arm not level, causing stress

Arm level, no stress

on mounting point

on mounting point

ßSlide and lock the projector onto the adjuster plate.

3. — Verify the Image Location

a. Connect a power cable to the projector and

turn it on.

b. Verify image size and location by loosening the

PCM 340 pipe adapter plate wing nuts, and

adjust the plate (left-right) to center the image.

TIP: Remember to include the vertical and

horizontal offsets when aligning the projector.

See the projector manual for information

c. When satisfied, tighten down the plate wing

nuts.

 

Projector

 

Center Line

 

Measure the

 

horizontal offset

 

Lens

 

Center Line

TIP:

Horizontal offset

PoleVault IP Systems • Installation — Stage 1 (Screen and Projector)

15

Image 19
Contents PoleVault IP Systems Sicherheitsanweisungen Deutsch Safety InstructionsGuide on the Extron website FCC Class B NoticeVariables are written in slanted form as shown here Specifications AvailabilityConventions Used in this Guide Letter oPoleVault IP System OverviewPoleVault IP System Installation and Wiring Overview Typical Classroom Installation Before You Begin Planning the InstallationLocation of the Screen and Projector Location of MediaLink Controller and Wall Plates Included Items InventorySee rear cover for contact numbers KitsItems Not Included Installation Overview Outline of Installation Steps Stage Installing the Screen Projector Place the PCM 340 on the T-bar Install Projector to Verify LocationMark Screen Location Mark the screen locationScrew the adjuster plate onto the base of the pipe Viii. Evenly balanced configuration Using the slots on the bracket that areClosest to the barrel on each arm, place Verify the Image Location Slide and lock the projector onto the adjuster plateTake the measurements with the PCM 340 on the T-frame Preliminary Safety Hardware InstallationMark the structural ceiling for lag eye bolt installation Cut the Ceiling TileFinish Projector Drop Ceiling Mount Installation Attach the turnbuckles at the corners of the PCM Secure the Projector Drop Ceiling Mount to the CeilingHand tighten all four turnbuckles Install the Screen Install the Electrical Box if requiredShock or serious injury. For safety Install the Raco box and plaster ring onto the PCMPage PVT CV D and PVT RGB D IP Plus AV Source Input Wallplates Cabling for the Wallplates and MediaLink Controller PVT transmitter installationMLC 104 IP Plus installation MLS 104 IP Plus MediaLink ControllerFeatures for MLC Mud Ring Installation Install the Mud RingsInsert the PVT mud ring into the wall Provide strain relief Signal Cable Label colorPull the cables at each location Install Wall Plates Connect the MLC 104 IP Plus to the switcher Install MediaLink ControllerTerminal RS-232 Cable color Pin Connect to the LAN using a CAT 5 cableTCP/IP Connections made to the MLC 104 IP PlusCabling for the Speakers Stage 3 Involves Installing the Devices Shown BelowSpeaker Installation FF 120 Flat Field Ceiling SpeakersCut Ceiling Tile Install the Speaker on the Drop CeilingMark and cut the tile Attach safety cable Stereo output Dual mono output Terminate the Speaker Cable for the PVS SwitcherWire the captive screw connector Stereo or dual mono output using parallel speaker wiringRear View PVS 305SA IP PoleVault SwitcherStage 4 Involves Installing the Devices Shown Below PMK 550 Pole Mount KitInstall the PMK 550 Base Plate Switcher and Projector Cable Overview Pull the Cables at the Switcher locationGather the cables, pass them down the pipe Your completed connections should look like the image below Finish installing the Pole Mount KitConfigure the Switcher MLS Switcher Configuration Program Stage 5 Involves Installing the Programs Shown BelowConfigurator Configure the System GlobalTest the System Check that an image is present, and adjust as neededAdjust the audio levels on the PVS 305SA IP Test the MLC configuration is correctFinal Installation Preset Switch setting Resolution Number Using Preset ModeAny changes to the Edid settings as needed When the image is correct, re-install the wallplateOn the rear panel, set all the DIP switches to off down Using Learn Mode Available on PVT RGB D Plus onlyInstallation Procedure Optional Accessory Installation VoiceLift SystemVoiceLift System Included parts Priority Page Sensor Kit Included Parts Optional Accessory Installation Priority Page Sensor KitTypical paging system with PVS 305SA IP switcher Configuration program for MLSPoleVault Switchers PVS, available at Testing and Adjustment ProcedureExtron Warranty Outline of Installation Steps