Extron electronic 305SA Optional Accessory Installation VoiceLift System, Installation Procedure

Page 48

Optional Accessory Installation — VoiceLift System

The Extron VoiceLift system is an easy-to-use, low-power, voice amplification system that ensures the speaker’s voice can be clearly heard at a comfortable level throughout the classroom. Speech is picked up by the pendant microphone worn by the teacher and is transmitted via wireless from a base station receiver and the

PVS 305SA IP to the installed ceiling speakers.

For detailed installation information, see the VoiceLift Installation Instructions, supplied with the device.

VoiceLift System Included parts:

VLP 102 pendant microphone

VLR 102 Receiver

Wall charger

Installation Procedure

1.Determine the optimal receiver location and mark and drill a 2.5 inch diameter hole in the ceiling tile where it is to be installed.

2.Insert the ceiling bracket screw through the back plate (attached to the housing) and the hole in the ceiling tile and loosely attach the Z bracket.

3.Align the back plate knockout over the hole in the ceiling tile and tighten the bracket screw to secure.

4.Replace the ceiling tile.

5.Pull the communication and power RJ-45 Ethernet cable (and other secondary use cables) through the receiver base and connect the Ethernet cable to the Receiver Out port (the RJ-45 connector on the left on the receiver base).

6.If desired, set the Tone and Mix DIP switches on the receiver base.

7.Place the dome onto the housing, align the arrows on the dome locking tab and on the housing rim. Turn the dome until it locks in place (approximately 1/8 turn).

8.Pull the cables from the receiver to the

PVS 305SA IP switcher location, through the pipe and down into the PMK 550.

B Attach the Z bracket to the ceiling tile and the back plate.

Tab

Arrow

 

Dot

 

Tab

 

Align Arrows

Twist to

Arrow

Lock

 

Receiver

Dome

G Align the arrows on the housing rim and the dome tab.

9.Disconnect the power from the switcher, and plug the included VoiceLift RJ-45 into the

PVS 305SA IP VoiceLift receiver port.

10.Replace power to the switcher. This also powers the VoiceLift receiver.

 

 

 

LINE OUT

AMPLIFIED AUDIO OUT

LAN 3

LAN 4

 

 

 

 

DO NOT

 

 

 

 

 

 

 

 

 

GROUND

 

 

 

 

 

 

 

 

 

OR SHORT

 

 

2/4/8

 

 

 

 

 

SPEAKER

 

 

 

Ohms

 

VIDEO

VOICELIFT

L

R

OUTPUTS

 

 

 

 

 

RECEIVER

CLASS 2 WIRING

L

R

 

 

 

 

 

 

 

 

 

L

R

10V

50mA

CONTROL

 

 

 

 

 

 

 

Tx Rx IR

12V

 

 

 

AUX AUDIO

PAGING

VOL/MUTE

RS-232 MLC/IR

LAN 2

 

 

 

INPUT 5

SENSOR

 

LAN 1

VoiceLift

Input

I Plug VoiceLift cable into PVS 305SA IP.

44PoleVault IP Systems • Optional Accessories

Image 48
Contents PoleVault IP Systems Safety Instructions Sicherheitsanweisungen DeutschFCC Class B Notice Guide on the Extron websiteSpecifications Availability Conventions Used in this GuideLetter o Variables are written in slanted form as shown hereOverview PoleVault IP SystemPoleVault IP System Installation and Wiring Overview Before You Begin Planning the Installation Typical Classroom InstallationLocation of the Screen and Projector Location of MediaLink Controller and Wall Plates Inventory Included ItemsKits See rear cover for contact numbersItems Not Included Installation Overview Outline of Installation Steps Stage Installing the Screen Projector Install Projector to Verify Location Mark Screen LocationMark the screen location Place the PCM 340 on the T-barScrew the adjuster plate onto the base of the pipe Using the slots on the bracket that are Viii. Evenly balanced configurationClosest to the barrel on each arm, place Slide and lock the projector onto the adjuster plate Verify the Image LocationPreliminary Safety Hardware Installation Mark the structural ceiling for lag eye bolt installationCut the Ceiling Tile Take the measurements with the PCM 340 on the T-frameFinish Projector Drop Ceiling Mount Installation Secure the Projector Drop Ceiling Mount to the Ceiling Attach the turnbuckles at the corners of the PCMHand tighten all four turnbuckles Install the Electrical Box if required Shock or serious injury. For safetyInstall the Raco box and plaster ring onto the PCM Install the ScreenPage PVT CV D and PVT RGB D IP Plus AV Source Input Wallplates PVT transmitter installation MLC 104 IP Plus installationMLS 104 IP Plus MediaLink Controller Cabling for the Wallplates and MediaLink ControllerInstall the Mud Rings Features for MLC Mud Ring InstallationInsert the PVT mud ring into the wall Signal Cable Label color Provide strain reliefPull the cables at each location Install Wall Plates Install MediaLink Controller Connect the MLC 104 IP Plus to the switcherConnect to the LAN using a CAT 5 cable Terminal RS-232 Cable color PinConnections made to the MLC 104 IP Plus TCP/IPStage 3 Involves Installing the Devices Shown Below Speaker InstallationFF 120 Flat Field Ceiling Speakers Cabling for the SpeakersInstall the Speaker on the Drop Ceiling Cut Ceiling TileMark and cut the tile Attach safety cable Terminate the Speaker Cable for the PVS Switcher Wire the captive screw connectorStereo or dual mono output using parallel speaker wiring Stereo output Dual mono outputPVS 305SA IP PoleVault Switcher Stage 4 Involves Installing the Devices Shown BelowPMK 550 Pole Mount Kit Rear ViewInstall the PMK 550 Base Plate Pull the Cables at the Switcher location Switcher and Projector Cable OverviewGather the cables, pass them down the pipe Finish installing the Pole Mount Kit Your completed connections should look like the image belowStage 5 Involves Installing the Programs Shown Below Configure the Switcher MLS Switcher Configuration ProgramConfigure the System Global ConfiguratorCheck that an image is present, and adjust as needed Test the SystemTest the MLC configuration is correct Adjust the audio levels on the PVS 305SA IPFinal Installation Using Preset Mode Any changes to the Edid settings as neededWhen the image is correct, re-install the wallplate Preset Switch setting Resolution NumberUsing Learn Mode Available on PVT RGB D Plus only On the rear panel, set all the DIP switches to off downOptional Accessory Installation VoiceLift System Installation ProcedureVoiceLift System Included parts Optional Accessory Installation Priority Page Sensor Kit Priority Page Sensor Kit Included PartsConfiguration program for MLS PoleVault Switchers PVS, available atTesting and Adjustment Procedure Typical paging system with PVS 305SA IP switcherExtron Warranty Outline of Installation Steps