Extron electronic 305SA manual Before You Begin Planning the Installation

Page 7

Before You Begin — Planning the Installation

Before installation is started, you must be consider several major factors to ensure that the installation process is as smooth and trouble free as possible, and so that the final finished project meets the needs of the customers, users, audiences, and installer.

The installation considerations on the following pages, though not comprehensive, should be consulted to help ensure that key installation aspects have been considered.

Americans with Disabilities Act (ADA) Compliance

When planning where to install the Polevault System, you may need to consider factors affecting accessibility of the system such as the height of devices from the floor (for example the MLC controller), distance from obstructions, and how far a user must reach to press any device buttons.

For guidelines, see sections 307 (“Protruding Objects”) and 308 (“Reach Ranges”) of the 2010 ADA Standards for Accessible Design available at http://www.ada.gov/regs2010/2

010ADAStandards/2010ADAStandards.pdf

Room Layout

a. The Room

The application diagram below shows a typical classroom installation.

PoleVault System

Figure 2. Typical Classroom Installation

Room factors to be considered should include, but are not confined to:

Room size, orientation, and layout:

Audience factors (for example number, ADA requirements, seating arrangements)

Existing installed furniture (bookcases, racks, cabinets, workbenches, sinks, and so forth.)

Windows, doors, and support pillar locations in relationship to the proposed screen location

PoleVault IP Systems • Introduction

3

Image 7
Contents PoleVault IP Systems Sicherheitsanweisungen Deutsch Safety InstructionsGuide on the Extron website FCC Class B NoticeVariables are written in slanted form as shown here Specifications AvailabilityConventions Used in this Guide Letter oPoleVault IP System OverviewPoleVault IP System Installation and Wiring Overview Typical Classroom Installation Before You Begin Planning the InstallationLocation of the Screen and Projector Location of MediaLink Controller and Wall Plates Included Items InventorySee rear cover for contact numbers KitsItems Not Included Installation Overview Outline of Installation Steps Stage Installing the Screen Projector Place the PCM 340 on the T-bar Install Projector to Verify LocationMark Screen Location Mark the screen locationScrew the adjuster plate onto the base of the pipe Viii. Evenly balanced configuration Using the slots on the bracket that areClosest to the barrel on each arm, place Verify the Image Location Slide and lock the projector onto the adjuster plateTake the measurements with the PCM 340 on the T-frame Preliminary Safety Hardware InstallationMark the structural ceiling for lag eye bolt installation Cut the Ceiling TileFinish Projector Drop Ceiling Mount Installation Attach the turnbuckles at the corners of the PCM Secure the Projector Drop Ceiling Mount to the CeilingHand tighten all four turnbuckles Install the Screen Install the Electrical Box if requiredShock or serious injury. For safety Install the Raco box and plaster ring onto the PCMPage PVT CV D and PVT RGB D IP Plus AV Source Input Wallplates Cabling for the Wallplates and MediaLink Controller PVT transmitter installationMLC 104 IP Plus installation MLS 104 IP Plus MediaLink ControllerFeatures for MLC Mud Ring Installation Install the Mud RingsInsert the PVT mud ring into the wall Provide strain relief Signal Cable Label colorPull the cables at each location Install Wall Plates Connect the MLC 104 IP Plus to the switcher Install MediaLink ControllerTerminal RS-232 Cable color Pin Connect to the LAN using a CAT 5 cableTCP/IP Connections made to the MLC 104 IP PlusCabling for the Speakers Stage 3 Involves Installing the Devices Shown BelowSpeaker Installation FF 120 Flat Field Ceiling SpeakersCut Ceiling Tile Install the Speaker on the Drop CeilingMark and cut the tile Attach safety cable Stereo output Dual mono output Terminate the Speaker Cable for the PVS SwitcherWire the captive screw connector Stereo or dual mono output using parallel speaker wiringRear View PVS 305SA IP PoleVault SwitcherStage 4 Involves Installing the Devices Shown Below PMK 550 Pole Mount KitInstall the PMK 550 Base Plate Switcher and Projector Cable Overview Pull the Cables at the Switcher locationGather the cables, pass them down the pipe Your completed connections should look like the image below Finish installing the Pole Mount KitConfigure the Switcher MLS Switcher Configuration Program Stage 5 Involves Installing the Programs Shown BelowConfigurator Configure the System GlobalTest the System Check that an image is present, and adjust as neededAdjust the audio levels on the PVS 305SA IP Test the MLC configuration is correctFinal Installation Preset Switch setting Resolution Number Using Preset ModeAny changes to the Edid settings as needed When the image is correct, re-install the wallplateOn the rear panel, set all the DIP switches to off down Using Learn Mode Available on PVT RGB D Plus onlyInstallation Procedure Optional Accessory Installation VoiceLift SystemVoiceLift System Included parts Priority Page Sensor Kit Included Parts Optional Accessory Installation Priority Page Sensor KitTypical paging system with PVS 305SA IP switcher Configuration program for MLSPoleVault Switchers PVS, available at Testing and Adjustment ProcedureExtron Warranty Outline of Installation Steps