Extron electronic 305SA manual Install the Mud Rings, Insert the PVT mud ring into the wall

Page 27

NOTE: The installation must conform to national and local building and electrical codes, and

UL requirements. See the device user guides for details.

1. — Install the Mud Rings

NOTE: These devices can be installed using the

supplied mud ring or a wall box. If installing

a box, allow enough depth for the plate, and

the cables. The box should be at least 2.5

inches (6.4 cm) deep to accommodate the

connectors and cables.

If a suitable wall box is already installed, follow

step 2 onwards.

a.Using the mud ring as a template, trace the inside of the mud ring onto the mounting surface.

b.Cut out the material within the marked area.

c.Insert the mud ring into the opening. The mud ring locking arms should fit easily into the opening. Flip over the mud ring locking arms and secure with the screws provided.

TIP: Use a level when fitting the mud ring.

Repeat steps a to c for each additional input wall plate that needs to be installed.

Wall

Wall Mounting

Mud Ring

ÛInsert the PVT mud ring into the wall.

d.At the desired location mark the opening for the larger MLC 104 IP Plus mud ring.

e.Repeat steps b and c.

 

Wall

4.06"

Rotate locking arm

and insert into wall

 

 

opening.

3.75"

 

 

Supplied Mudring for

 

MLC 104 IP Plus

 

Wall Mouting

 

Bracket

Ü Features for MLC Mud Ring Installation

PoleVault IP Systems • Installation — Stage 2 (Wallplates and MLC)

23

Image 27
Contents PoleVault IP Systems Sicherheitsanweisungen Deutsch Safety InstructionsGuide on the Extron website FCC Class B NoticeVariables are written in slanted form as shown here Specifications AvailabilityConventions Used in this Guide Letter oPoleVault IP System OverviewPoleVault IP System Installation and Wiring Overview Typical Classroom Installation Before You Begin Planning the InstallationLocation of the Screen and Projector Location of MediaLink Controller and Wall Plates Included Items InventorySee rear cover for contact numbers KitsItems Not Included Installation Overview Outline of Installation Steps Stage Installing the Screen Projector Place the PCM 340 on the T-bar Install Projector to Verify LocationMark Screen Location Mark the screen locationScrew the adjuster plate onto the base of the pipe Using the slots on the bracket that are Viii. Evenly balanced configurationClosest to the barrel on each arm, place Verify the Image Location Slide and lock the projector onto the adjuster plateTake the measurements with the PCM 340 on the T-frame Preliminary Safety Hardware InstallationMark the structural ceiling for lag eye bolt installation Cut the Ceiling TileFinish Projector Drop Ceiling Mount Installation Secure the Projector Drop Ceiling Mount to the Ceiling Attach the turnbuckles at the corners of the PCMHand tighten all four turnbuckles Install the Screen Install the Electrical Box if requiredShock or serious injury. For safety Install the Raco box and plaster ring onto the PCMPage PVT CV D and PVT RGB D IP Plus AV Source Input Wallplates Cabling for the Wallplates and MediaLink Controller PVT transmitter installationMLC 104 IP Plus installation MLS 104 IP Plus MediaLink ControllerInstall the Mud Rings Features for MLC Mud Ring InstallationInsert the PVT mud ring into the wall Signal Cable Label color Provide strain reliefPull the cables at each location Install Wall Plates Connect the MLC 104 IP Plus to the switcher Install MediaLink ControllerTerminal RS-232 Cable color Pin Connect to the LAN using a CAT 5 cableTCP/IP Connections made to the MLC 104 IP PlusCabling for the Speakers Stage 3 Involves Installing the Devices Shown BelowSpeaker Installation FF 120 Flat Field Ceiling SpeakersInstall the Speaker on the Drop Ceiling Cut Ceiling TileMark and cut the tile Attach safety cable Stereo output Dual mono output Terminate the Speaker Cable for the PVS SwitcherWire the captive screw connector Stereo or dual mono output using parallel speaker wiringRear View PVS 305SA IP PoleVault SwitcherStage 4 Involves Installing the Devices Shown Below PMK 550 Pole Mount KitInstall the PMK 550 Base Plate Pull the Cables at the Switcher location Switcher and Projector Cable OverviewGather the cables, pass them down the pipe Your completed connections should look like the image below Finish installing the Pole Mount KitConfigure the Switcher MLS Switcher Configuration Program Stage 5 Involves Installing the Programs Shown BelowConfigurator Configure the System GlobalTest the System Check that an image is present, and adjust as neededAdjust the audio levels on the PVS 305SA IP Test the MLC configuration is correctFinal Installation Preset Switch setting Resolution Number Using Preset ModeAny changes to the Edid settings as needed When the image is correct, re-install the wallplateOn the rear panel, set all the DIP switches to off down Using Learn Mode Available on PVT RGB D Plus onlyOptional Accessory Installation VoiceLift System Installation ProcedureVoiceLift System Included parts Priority Page Sensor Kit Included Parts Optional Accessory Installation Priority Page Sensor KitTypical paging system with PVS 305SA IP switcher Configuration program for MLSPoleVault Switchers PVS, available at Testing and Adjustment ProcedureExtron Warranty Outline of Installation Steps