Extron electronic 305SA manual PVT CV D and PVT RGB D IP Plus AV Source Input Wallplates

Page 25

Stage 2:

Mounting the PVT

Wallplates and the

MediaLink Controller

Stage 2 Involves Installing and Cabling the Devices Shown Below.

NOTE: The installation must conform to national and local electrical codes and UL requirements. See the

device user guide for details.

PVT CV D and PVT RGB D IP Plus AV Source Input Wallplates

PVT CV D

PVT RGB D IP Plus

 

 

 

FRONT

REAR

 

 

 

 

Line Out Audio

 

 

 

 

Output Port

 

Audio and

 

VIDEO IN

Audio and

 

 

 

Video input

 

Video input

 

 

 

 

AUDIO IN

Connectors

 

Connectors

 

 

L

R

 

 

 

IR OUT

 

 

 

 

S G

Local Monitor

 

IR Output

 

 

 

 

 

Output Port

 

 

 

 

 

 

 

 

IR Output

Decora

Mounting

Audio and Video

IR Input

AUDIO

IN OUT

COMPUTER IN

MONITOR OUT

S G

IR OUT

FRONT

EDID Learn

Button

EDID Learn

Status LED

CAT5e

CAT5e

RJ-45 LAN

Pass-through

Input

Connectors

Faceplate

Screws (2)

Output Port (at rear)

Connector

 

(at rear)

 

 

 

REAR

5-pole EDID DIP switch (at rear)

Where it goes: Installs in a wall near input source location.

 

 

 

 

Line Out

What it does: Transmits an input source’s composite or RGB

 

 

 

L

Audio

video signal and audio signals to the switcher.

CAT5e

 

 

 

Connector

 

1 2 3

ON

G R

(at rear)

In addition the PVT RGB D IP Plus allows pass-through Ethernet

 

4

 

G

 

connection.

 

5

 

 

 

 

RGB A

 

RGB B

 

 

 

 

 

S

IR Input

 

CAT5e

OUT

 

OUT

NOTES:

 

 

 

 

Connector

 

 

 

 

(at rear)

 

 

 

 

 

The PVT CV D is a 1-gang wallplate.

 

 

 

 

 

The PVT RGB D IP Plus is a 2-gang wallplate.

RJ-45 LAN Pass-through

 

Audio and Video

Both the PVT RGB D IP Plus and the optional

Connectors (2 at rear)

 

 

Output Ports (2** at rear)

** Each RGB Wallplate needs

 

PVT RGB D (EDID) incorporate EDID Minder. This allows

 

2 Output Cables, A and B.

 

the transmitter to communicate the appropriate EDID

 

 

 

 

 

 

information to the source, ensuring correct video output

 

 

 

 

 

resolution.

 

 

 

 

 

Before fully installing the PVT RGB D IP Plus wallplate,

 

 

 

 

 

see EDID MInder on page 42 for setup and operating

 

 

 

 

 

details.

 

 

 

 

 

PoleVault IP Systems • Installation — Stage 2 (Wallplates and MLC)

21

Image 25
Contents PoleVault IP Systems Sicherheitsanweisungen Deutsch Safety InstructionsGuide on the Extron website FCC Class B NoticeConventions Used in this Guide Specifications AvailabilityLetter o Variables are written in slanted form as shown herePoleVault IP System OverviewPoleVault IP System Installation and Wiring Overview Typical Classroom Installation Before You Begin Planning the InstallationLocation of the Screen and Projector Location of MediaLink Controller and Wall Plates Included Items InventorySee rear cover for contact numbers KitsItems Not Included Installation Overview Outline of Installation Steps Stage Installing the Screen Projector Mark Screen Location Install Projector to Verify LocationMark the screen location Place the PCM 340 on the T-barScrew the adjuster plate onto the base of the pipe Viii. Evenly balanced configuration Using the slots on the bracket that areClosest to the barrel on each arm, place Verify the Image Location Slide and lock the projector onto the adjuster plateMark the structural ceiling for lag eye bolt installation Preliminary Safety Hardware InstallationCut the Ceiling Tile Take the measurements with the PCM 340 on the T-frameFinish Projector Drop Ceiling Mount Installation Attach the turnbuckles at the corners of the PCM Secure the Projector Drop Ceiling Mount to the CeilingHand tighten all four turnbuckles Shock or serious injury. For safety Install the Electrical Box if requiredInstall the Raco box and plaster ring onto the PCM Install the ScreenPage PVT CV D and PVT RGB D IP Plus AV Source Input Wallplates MLC 104 IP Plus installation PVT transmitter installationMLS 104 IP Plus MediaLink Controller Cabling for the Wallplates and MediaLink ControllerFeatures for MLC Mud Ring Installation Install the Mud RingsInsert the PVT mud ring into the wall Provide strain relief Signal Cable Label colorPull the cables at each location Install Wall Plates Connect the MLC 104 IP Plus to the switcher Install MediaLink ControllerTerminal RS-232 Cable color Pin Connect to the LAN using a CAT 5 cableTCP/IP Connections made to the MLC 104 IP PlusSpeaker Installation Stage 3 Involves Installing the Devices Shown BelowFF 120 Flat Field Ceiling Speakers Cabling for the SpeakersCut Ceiling Tile Install the Speaker on the Drop CeilingMark and cut the tile Attach safety cable Wire the captive screw connector Terminate the Speaker Cable for the PVS SwitcherStereo or dual mono output using parallel speaker wiring Stereo output Dual mono outputStage 4 Involves Installing the Devices Shown Below PVS 305SA IP PoleVault SwitcherPMK 550 Pole Mount Kit Rear ViewInstall the PMK 550 Base Plate Switcher and Projector Cable Overview Pull the Cables at the Switcher locationGather the cables, pass them down the pipe Your completed connections should look like the image below Finish installing the Pole Mount KitConfigure the Switcher MLS Switcher Configuration Program Stage 5 Involves Installing the Programs Shown BelowConfigurator Configure the System GlobalTest the System Check that an image is present, and adjust as neededAdjust the audio levels on the PVS 305SA IP Test the MLC configuration is correctFinal Installation Any changes to the Edid settings as needed Using Preset ModeWhen the image is correct, re-install the wallplate Preset Switch setting Resolution NumberOn the rear panel, set all the DIP switches to off down Using Learn Mode Available on PVT RGB D Plus onlyInstallation Procedure Optional Accessory Installation VoiceLift SystemVoiceLift System Included parts Priority Page Sensor Kit Included Parts Optional Accessory Installation Priority Page Sensor KitPoleVault Switchers PVS, available at Configuration program for MLSTesting and Adjustment Procedure Typical paging system with PVS 305SA IP switcherExtron Warranty Outline of Installation Steps