Alamo 02984405 Pre-Delivery Inspection Checklist, Saftey Equipment, Frame and Boom

Models: 02984405

1 106
Download 106 pages 12.28 Kb
Page 102
Image 102
PRE-DELIVERY INSPECTION CHECKLIST

PRE-DELIVERY INSPECTION CHECKLIST

Pre-Operation Inspection: Check the following items before operating the unit to assure that they are properly assembled. (See previous pages for component location)

Saftey Equipment:

-----Operators Manual is with Unit.

-----The Safety Decals are installed as listed in the Assembly Manual.

-----Valve operation plate is installed.

-----Operators cage or Tractor Cab is in place.

-----Deflectors are installed on the Mower Head.

-----Tractor Rops or Cab with seatbels installed properly.

Frame and Boom:

-----Axle Plate Bolts are torqued.

-----Boom Rest Axle Plate Bolts are torqued.

-----Front Rail Bolts are torqued .

-----Front Support Bolts at tractor are torqued.

-----Rear Rail Bolts torque .

-----Rotator bolts torque to.

-----All Welds inspected toinsure proper welds and locations.

Hydraulic System:

-----Oil Level in Hydraulic Tank is within the sight gauge.

-----Hose connections are tight.

-----Hoses do not have any kinks or twist in them.

-----Front Pump Shaft adapter bolts are tight..

-----Front Pump Shaft Coupler / Drive Shaft is lubricated and has an anti-seize compound on the Splines of Pump and Shafts.

-----The Pump Drive Shaft has correct alignment.

-----Suction Hose has no leaks or kinks.

Rotary Mower Head:

-----Skid Shoe Bolts are torqued to 120 ft. lbs.

-----Spindle Housing Bolts are torqued to 400 ft. lbs.

-----The Spindle Housing is properly lubricated.

-----Motor Bolts are torqued to 120 ft. lbs.

-----Blade Carrier (Bar) Bolts torque to 400 ft. lbs.

-----Blade Bolts are torqued and the retainings Pins are in place.

-----Blades Swing freely.

Boom:

-----All Hoses tightened and no leaks.

-----All hoses secured to where they will not rub, get pinched or hanging down where they may catch on something.

-----All Decals installed

-----Pump Primed and Pressure adjusted if needed (only applys to Pump for Cylinder control.

Axtreme Boom (Asy. Manl) 07/06