4.Turret Assembly Grease Fittings. The turret assembly has three grease fittings around the OD of it. The grease fittings are 120° apart, this is to make certain that the bearing will be greased all the way around because of the large diameter of the bearing. This bearing must be greased before unit is put into service. It is easier to get to grease fittings now than after boom has been installed. On the under side of the turret assembly are the grease fittings for the swing cylinder pivot mounts, these need to be greased before operating the unit. Also there is a bolt on cover on the under side of turret that will be installed (See Figure 40) at a later time. Greasing the cylinder pivots will need to be done before the cover is installed (See Figure 39) and the boom swing stop will need to be adjusted, but this cannot be done until a later time making it best to leave this cover of until then. After greasing components at assembly of unit operator should consult the operators manual for maintenance requirements.

Frame Installation

3.Turret Assembly Installation. Theturret assembly mounts on the RH side onto the center section under frame (See Figure 36 & 37) . Using a hoist (or other lifting device) lower the turret assembly until it is level with the underframe. Slide the turret assembly inward toward the under frame until the retaining pin tube on under frame an turret assembly align. Installthe long upper retaining pin and then the two small front and rear pins. The long upper pin is retained with two cotter pins that need to be bent over on the ends. The short pins are retained with nuts and bolts (See Figure 36 & 38).

Figure 37

Figure 38

4.Turret Assembly Grease Fittings. The turret assembly has three grease fittings around the OD of it. The grease fittings are 120° apart, this is to make certain that the bearing will be greased all the way around because of the large diameter of the bearing. This bearing must be greased before unit is put into service. It is easier to get to grease fittings now than after boom has been installed. On the under side of the turret assembly are the grease fittings for the swing cylinder pivot mounts, these need to be greased before operating the unit. Also there is a bolt on cover on the under side of turret that will be installed (See Figure 40) at a later time. Greasing the cylinder pivots will need to be done before the cover is installed (See Figure 39) and the boom swing stop will need to be adjusted, but this cannot be done until a later time making it best to leave this cover of until then. After greasing components at assembly of unit operator should consult the operators manual for maintenance requirements.

Figure 39

Figure 40