Anritsu manual Preparing The System, Operations, General, ME7840A OMM

Models: ME7840A

1 126
Download 126 pages 42.52 Kb
Page 37
Image 37
PREPARING THE SYSTEM

OPERATIONS, GENERAL

PREPARING THE SYSTEM

 

 

 

Customer Supplied

GPIBSystem Controller (PC) with GPIB

Customer Supplied Power Meter

for flat test port power calibration

7 8 9

4 5 6

1 2 3

0+ / -

 

 

 

 

MS462X3C

 

 

 

 

DRA Scorpion

GPIB

Port 3

Port 1

Port 2

To: Ext. Analog

 

 

 

 

 

 

 

 

In connector

 

 

 

 

MS4782A or D

CALIBRATOR

Port 3

Port 1

Port 2

Test Set

 

A

 

 

 

 

 

 

Test

Test

 

ON / OFF

CLR

Sensor Channel Trigger

B

Port 2

System Cal / Zero

Port 1

50 Ohm Terminations

 

Sensor

 

*

 

Customer Supplied Power Supply

for AUT

Input

Output

Amplifier Under Test (AUT)

Optional

 

Current Probe

 

* Connect when directed by procedure for power calibrations

Figure 3-1.PATS Power On Sequence

ME7840A OMM

3-3

Page 37
Image 37
Anritsu manual Preparing The System, Operations, General, ME7840A OMM