Manuals
/
Brands
/
Lawn and Garden
/
Portable Generator
/
AOC
/
Lawn and Garden
/
Portable Generator
AOC
15
- page 133
1
133
241
241
Download
241 pages, 6.42 Mb
Appendix C
-
5 Assembly Details for SSV Section 9N323 Base
NOTICE:
Use of the material contained in this document is subject to the warning on page Iv and the disclaimer on page v of this document.
DOC012R02
AOC 15/50 User Manual
Nov 2001
125
Contents
Main
Page
6.0 Tower and Wind Turbine Generator Installation................................. 35
8.0 Function Tests and Commissioning..................................................... 61
Page
WARNING
DISCLAIMER
Page
Part I
Page
1.0 Introduction
Page
Page
Page
2.0 System Description
Page
Page
Page
Page
Page
3.0 Safety Guidelines
Page
Page
CAUTION
Page
Page
Page
Page
Part II
Page
4.0 Planning and Installation Checklist
Page
Page
Page
Page
Page
Page
Page
5.0 Site Preparation
Page
Page
Page
6.0 Tower and Wind Turbine Generator Installation
Page
Page
Page
Page
Page
Page
Page
Page
4 Corner Bolts
Page
Page
Page
Page
Page
Page
Page
Page
7.0 Electrical Installation
Page
Page
Page
Page
Page
Page
Page
8.0 Function Tests and Commissioning
Page
Page
Page
Part III
Page
9.0 Wind Turbine Operation
Page
Page
Page
9.0 Wind Turbine Operation
71
Page
9.0 Wind Turbine Operation
73
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
11.0 Maintenance
Page
Page
Page
Page
Page
12.0 Troubleshooting
Page
Page
Page
Page
Page
Page
Page
Page
Page
13.0 Spare Parts
Page
Page
Page
Appendix A-1 50 Hz Specifications Sheet
109
AOC 15/50 50 Hz WTG Design Specifications
PERFORMANCE PARAMETERS
Appendix A-2 Design Specifications
110
AOC 15/50 60 Hz WTG Design Specifications
PERFORMANCE PARAMETERS
Page
Page
Appendix B: Turbine Assembly Drawings
Page
Page
Page
Page
Page
Appendix C: Assembly Drawings for 24.4 m (80 ft) Tower
Page
Page
Page
Page
Page
Page
Page
Appendix D: Assembly Drawings for 30.5 m (100 ft) Tower
Page
Page
Page
Page
Page
Page
Page
Appendix E: Crate Dimensions and Weights
Page
Appendix E Crate Dimensions and Weights
137
Page
Page
Page
Appendix F-1 Foundation Loads and Details
141
Page
Page
Page
Page
Page
Page
Page
Page
Page
Appendix G-1 Installation Records
151 Installation Records
Inspection of Shipped Components
Tower Assembly and Tower Erection
Blade Mounting
Tip Brake Installation
Installing Turbine
QA approval signature Date
Appendix G-3 Commissioning QA Checklist
154
Appendix H: Maintenance Records
Page
Page
Page
Appendix H-3 Voltage to Wind Speed Conversion Table
159
Appendix H-3 Voltage to Wind Speed Conversion Table
160
Appendix I: Tools and Equipment
Page
Appendix I-1 Recommended Tools For Installation
163
Appendix I-2 Recommended Tools For Routine Maintenance
164
Tools Required For Field Service Maintenance
Appendix J: Wire, Cable and Bolt Specifications
Page
Page
Page
Page
Page
Page
Page
Appendix K-1 Procurement Responsibilities
173 PROCUREMENT RESPONSIBILITY
Appendix K-2 Required Customer Power Grid Information
174
Required Customer Power Grid Information
Appendix L: 50Hz Electrical Schematics
Page
Appendix L-1 50 Hz Table of Contents
177
Page
Appendix L-3 AOC 15/50 Electronic Control, Box Layout, 50Hz
179
Control System Enclosures Tower
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Appendix L-19 AOC 15/50 Main Controller Terminal Strip, 50 Hz
196
Page
Page
Page
Page
Page
Page
Appendix M: 60 Hz Electrical Schematics
Page
Page
Page
Appendix M-3 AOC 15/50 Electronic Control, Box Layout, 60 Hz
207
Control System Enclosures Tower
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Appendix M-20 AOC 15/50 Main Controller Terminal Strip, 60 Hz
224