6.0 Tower and Wind Turbine Generator Installation

48

technician standing on a platform (see Figure 6-14). The same procedures for attaching and aligning the third blade should be used as were described in Section 6.4.

APPROXIMATE C. G. LINE

Figure 6-13 Wind turbine generator lift

When all blades and tip brakes have been mounted correctly, the parking brake should be engaged and a tagline attached to the two downward pointing blades, around the tip brake hinge point. The twist cable attached to the base of the wind turbine generator should be looped and tied so that it is lifted with the turbine.

All necessary tools (see Appendix I) and hardware (mounting bolts, nuts and washers) should be taken to the top of the tower. 1" non-locking nuts are useful as quick fasteners to secure the tower top casting to the tower temporarily. These items may be raised together with the wind turbine generator to make climbing easier.

NOTICE: Use of the material contained in this document is subject to the warning on page Iv and the disclaimer on page v of this document.

DOC012R02

AOC 15/50 User Manual

Nov 2001

Page 56
Image 56
AOC 15 user manual Wind turbine generator lift