Appendix K-1 Procurement Responsibilities

173

 

 

 

 

 

 

PROCUREMENT RESPONSIBILITY

 

 

 

 

 

AOC

CUSTOMER

 

 

GENERAL DESCRIPTION

PROVIDES

PROVIDES

 

 

Wind Turbine Drivetrain

X

 

 

 

Gearbox

X

 

 

 

Generator

X

 

 

 

Parking Brake

X

 

 

 

Assembly Hardware

X

 

 

 

Blades (unassembled)

X

 

 

 

Tip Brakes

X

 

 

 

Tip Brake Cables

X

 

 

 

Assembly Hardware

X

 

 

 

Standard 80 ft Tower

X

 

 

 

Tower Safety Climbing Cable and harness

X

 

 

 

Foundation (engineering, materials, labor)

 

X

 

 

Anchor Bolts, Nuts and Template (standard foundation)

X

 

 

 

Weatherproof Controls Structure (If using non-NEMA 4 Enclosures)

 

X

 

 

Controls, Power Electronics and Enclosure (non-NEMA 4)(NEMA 4/tropical

X

 

 

 

optional)

 

 

 

 

 

 

 

Power Factor Correction

X

 

 

 

Grid Monitor

X

 

 

 

Surge Protector

X

 

 

 

PLC/Controls and Enclosure

X

 

 

 

Dynamic Brake Capacitors and Enclosure

X

 

 

 

Dynamic Brake Resistors and Enclosure

X

 

 

 

Generator Resistor Contactor Soft Start (optional)

X

 

 

 

Throw Switch

 

X

 

 

125 A, 3 Phase Circuit Breaker

 

X

 

 

75 KVA Transformer

 

X

 

 

Watts Transducer and Current Transformer (optional)

X

 

 

 

Parking Brake Heater

X

 

 

 

Transmission Heater

X

 

 

 

KWH Metering Device

 

X

 

 

Tower Base Pull Box (optional)

 

X

 

 

Twist Cable Jct Box

X

 

 

 

Control Cable (b/w generator jct box and twist cable jct box)

X

 

 

 

Power Cable (b/w generator jct box and twist cable jct box)

X

 

 

 

Anemometer Cable (b/w generator jct box and twist cable jct box)

X

 

 

 

Anemometer Cable (b/w twist cable jct box and controls and utility)

 

X

 

 

Control Cable (b/w twist cable jct box and controls and utility)

 

X

 

 

Power Cable (b/w twist cable jct box and controls and utility)

 

X

 

 

All Protective Conduit (b/w twist cable jct box and controls and utility)

 

X

 

 

Spare Parts

X

 

 

 

NOTE: This procurement checklist is a tool for planning purposes only and is by no means a

 

 

substitute for contractual agreements. Some items may or may not have been purchased by the

 

 

customer.

 

 

 

NOTICE: Use of the material contained in this document is subject to the warning on page Iv and the disclaimer on page v of this document.

DOC012R02

AOC 15/50 User Manual

Nov 2001

Page 181
Image 181
AOC 15 user manual Appendix K-1 Procurement Responsibilities 173, Procurement Responsibility