Appendix H-2 Maintenance Schedule

158

Scheduled Routine Maintenance for the AOC 15/50

Monthly (ground level inspection):

∙Visually inspect the wind turbine and site for obvious problems.

∙Record the meter and run time readings.

∙Inspect the dynamic brake components for discoloration or failure.

Six months after turbine installation:

∙Visually inspect the tower fasteners and carry out a random torque check.

∙Check and clean the electrical connections.

∙Check the blade bolt washer alignment and all accessible fasteners, especially the tower top bolts, blade bolts and yaw bearing bolts.

∙Inspect the yaw bearing and yaw lock.

∙Inspect the tip brakes.

∙Check the torque of the hinge block nuts and the tip brake plate fasteners.

∙Inspect the generator.

∙Inspect the gearbox for leaks and vent clogging.

∙Check the oil level in the site glass.

∙Inspect the main shaft for cracking.

∙Inspect the rotary transformer.

Annually

∙Check oil level in the site glass.

∙Grease the yaw bearing and yaw lock.

∙Clean the blades.

Every two years (or after severe events):

∙As for the inspection carried out after the first six months of operation

∙Clean the blades.

∙Re-calibrate the control system if necessary.

∙Inspect and replace the anemometers if necessary.

∙Inspect all exposed cables

Every five years:

∙As for the inspection carried out every two years.

∙Overhaul the wind turbine generator if the oil samples and/or inspection records indicate this to be necessary.

NOTICE: Use of the material contained in this document is subject to the warning on page Iv and the disclaimer on page v of this document.

DOC012R02

AOC 15/50 User Manual

Nov 2001

Page 166
Image 166
AOC 15 user manual Monthly ground level inspection, Six months after turbine installation, Annually, Every five years