AOC 15 user manual Siting Factors, Utility Factors

Models: 15

1 241
Download 241 pages 40.58 Kb
Page 32
Image 32

4.0 Planning and Installation Checklist

24

The following sections are intended to assist customers in addressing the relevant installation details in a logical sequence. Although most points apply to both large and small projects, not all will apply to every project. To ensure thorough planning, it is strongly recommended that customers understand why a particular detail is or is not appropriate to their installation.

By reviewing the entire list repeatedly throughout the project, the customer should be able to ensure that none of the details, necessary to complete it, have been overlooked.

4.1Siting Factors

Site selection has a significant effect on annual energy production. It is, therefore, worth the additional time and effort to locate the most suitable site to ensure optimal energy production and maximize the wind turbine’s lifespan. When selecting a site, the following factors should be considered:

Wind resource characteristics

§Average wind speed

§Makeup of wind speed average (frequency and duration of power producing winds)

§Prevailing wind direction(s)

§Turbulence

§Peak wind speeds

Height and location of obstructions

Distance from utility service point

Local restrictions relative to height, proximity to boundaries, etc.

Tower height

Proximity to other wind turbines

Site accessibility and its effect on construction and maintenance costs

Safety zone preventing public access

4.2Utility Factors

The AOC 15/50 includes an induction generator, which depends on the interfacing electrical system for excitation. Each wind turbine has a fixed set of power factor correction capacitors installed in the dynamic brake capacitor box. To ensure a safe and efficient installation, the following utility related factors should be considered:

Buy back rates, contract options, green pricing and net billing

Available line capacity (in kVA)

Available fault current

Voltage and phase configuration of the primary circuit and the local utility line

Distance to nearest substation

Size and winding configuration of the step down transformer required at the site (in kVA)

NOTICE: Use of the material contained in this document is subject to the warning on page Iv and the disclaimer on page v of this document.

DOC012R02

AOC 15/50 User Manual

Nov 2001

Page 32
Image 32
AOC 15 user manual Siting Factors, Utility Factors