Appendix G-2 Turbine Installation QA Checklist
NOTICE: Use of the material contained in this document is subject to the warning on page Iv and the disclaimer on page v of this
document.
DOC012R02 AOC 15/50 User Manual Nov 2001
153
Check
Ensure tip brake slides into blade end without obstruction
Tip brake cables properly attached to connector points
Ensure installation of low-profile washers
Torque 5/16 mounting nuts to 11 ft/lbs
Torque 3/8" studs to 18 ft/lbs
Perform tip brake pull test
Assy by Q.A. Date
Check
Tower top bolts torqued to 600 ft/lbs
Confirm free yaw with yaw lock disengaged
Install twist cables into twist cable junction box
Install anemometer assembly at proscribed location on tower
Assy by Q.A. Date