6.0 Tower and Wind Turbine Generator Installation | 36 |
The following sections describe the assembly of the tower, as well as its erection and the installation of the wind turbine generator.
6.1Tower Assembly
For the assembly details refer to the manufacturer’s instruction packet shipped with the tower. The tower assembly drawings for the standard 24.4 m (80 ft) tower are supplied in Appendix C; for those of the 30.5 m (100 ft) tower see Appendix D.
The tower will generally be assembled horizontally with two of its three legs near the ground. Blocks should be used to support these two legs at several locations along their length. The height of the blocks should be chosen to ensure that the tower is straight and to allow cross- braces to be bolted to the legs. The blocks must have sufficient strength and stability for the tower to be worked on safely.
After laying out the tower leg sections, the braces should be matched to their respective brace clips on the legs. Braces and legs are clearly stamped with their part numbers and are referenced in the tower drawings (see Appendix C or D). The bottom leg flanges of the bottom tower section and the upper leg flanges of the topmost tower section are angled. This ensures that they are parallel to the foundation and the turbine tower top casting once the tower is vertical.
The
The open angle on the
Brace bolts should be installed with the head on the inside of the tower and the nut on the outside. Flange bolts should be inserted from the bottom up, with the nut on the flange top. The flange bolts on the top and bottom most sections should be left slightly loose until the tower is in place, as should the
The 1” flange bolt nuts should be torqued to 340 Nm (250
NOTICE: Use of the material contained in this document is subject to the warning on page Iv and the disclaimer on page v of this document.
DOC012R02 | AOC 15/50 User Manual | Nov 2001 |