4.0 Planning and Installation Checklist

25

Line protection required

Cogeneration standards for small power producers

Interconnection hardware and wiring standards

System operation requirements:

§Voltage regulation

§Power factor

§Protective devices

§Utility/wind turbine interface responsibilities

To interface with the utility network correctly all power factor correction capacitors or unique loads connected to the utility system need to be identified by the customer. Furthermore, the Required Customer Power Grid Information sheet should be completed to assist AOC in designing the most suitable interface. See Appendix K.

4.3Permits and Approvals

Local authorities often require a wind turbine operator to obtain permits or approvals, some of which have been identified below. It is important to determine which of these apply to a site and whether any independent inspections are required.

Issuing Authority:

Municipality or local council

Country

State or Province

Federal (FAA, FCC, etc.)

Commission (energy, conservation, historic, etc.)

Utility

Type:

Construction

Foundation engineering

Electrical works

Interconnection

Zoning

Communication interference

Aviation interference

Environmental impact

4.4Plans and Drawings

NOTICE: Use of the material contained in this document is subject to the warning on page Iv and the disclaimer on page v of this document.

DOC012R02

AOC 15/50 User Manual

Nov 2001

Page 33
Image 33
AOC 15 user manual Permits and Approvals, Plans and Drawings