| ii |
6.1 | Tower Assembly | 36 |
6.2 | Tower Erection | 37 |
6.3 | Wind Turbine Component Preparation | 38 |
6.3.1 | Tip Brake Installation | 38 |
6.4 | Blade Installation | 41 |
6.5 | Lift Preparation | 46 |
6.6 | Lifting and Securing the Wind Turbine | 50 |
7.0 Electrical Installation | 53 | |
7.1 | Electrical Interface to Utility | 54 |
7.2 | Wiring and Cable Requirements | 56 |
7.2.1 | Power and Control Cable | 56 |
7.3 | Control Box Connections | 59 |
7.4 | Twist Cables and Junction Box | 60 |
8.0 Function Tests and Commissioning | 61 | |
8.1 | Function Tests and Commissioning | 62 |
8.2 | Generator Test | 63 |
Part III | .................................................................................................. | 65 |
9.0 Wind Turbine Operation | 67 | |
9.1 | Normal Operation | 68 |
9.1.1 | Turbine TEST/OFF/ON | 69 |
9.1.2 | Heater ON | 70 |
9.1.3 | Parking Brake Release | 70 |
9.1.4 | Rotor Jog | 72 |
9.1.5 | Dynamic Brake | 72 |
9.1.6 | Operator Interface Indicating Lights | 72 |
9.1.7 | PLC Description | 72 |
9.1.7.1 | PLC Inputs | 76 |
9.1.7.2 | PLC Outputs | 77 |
9.1.8 | Control Systems Options | 77 |
9.2 | Emergency Operation | 77 |
9.3 | Test Operation | 78 |
9.3.1 | Power Up | 78 |
9.3.2 | Parking Brake Release Test | 78 |
9.3.3 | Rotor Jog Test | 79 |
9.3.4 | Dynamic Brake Test | 79 |
9.3.5 | Anemometer Signal Test | 79 |
9.3.6 | Speed Sensor Signal Test | 80 |
9.3.7 | Normal | 80 |
9.3.8 | Emergency Shut down Test | 80 |
9.3.9 | Low Wind Shut Down Test | 80 |
9.4 | Environmental Considerations | 80 |
9.4.1 | Corrosion | 80 |
9.4.2 | Lightning | 81 |
9.4.3 | Ice and Snow | 81 |
NOTICE: Use of the material contained in this document is subject to the warning on page Iv and the disclaimer on page v of this document.
DOC012R02 | AOC 15/50 User Manual | Nov 2001 |