|
| i |
| Table of Contents |
|
WARNING | iv | |
DISCLAIMER | v | |
Part I | 1 | |
1.0 Introduction | 3 | |
1.1 | Manual Use | 4 |
1.2 | Cautionary Icons | 5 |
1.2.1 | Warning Icon | 5 |
1.2.2 | Caution Icon | 5 |
1.3 | Personnel Definitions | 5 |
1.3.1 | Installation Personnel | 5 |
1.3.2 | Operational Personnel | 5 |
1.3.3 | Maintenance Personnel | 6 |
2.0 System Description | 7 | |
2.1 | General Description and Features of the Turbine | 8 |
2.2 | Control System Description | 11 |
2.3 | Operation Description | 11 |
3.0 Safety Guidelines | 13 | |
3.1 | Personnel Training | 14 |
3.2 | Safety Equipment | 14 |
3.3 | 15 | |
3.4 | Securing Machine for Maintenance and Repair | 15 |
3.5 | Climbing Safety | 16 |
3.6 | Electrical Safety | 17 |
3.7 | Weather Related Safety | 17 |
3.8 | Emergency Procedure | 18 |
Part II | 21 | |
4.0 Planning and Installation Checklist | 23 | |
4.1 | Siting Factors | 24 |
4.2 | Utility Factors | 24 |
4.3 | Permits and Approvals | 25 |
4.4 | Plans and Drawings | 25 |
4.5 | Construction Planning Considerations | 26 |
4.6 | Electrical Planning Considerations | 27 |
4.7 | Installation Tools and Equipment | 27 |
4.8 | Installation Personnel Considerations | 28 |
4.9 | General Installation/Commissioning Timeline | 28 |
5.0 Site Preparation | 31 | |
5.1 | Site Access | 32 |
5.2 | Foundation Installation | 32 |
5.3 | Receiving the Wind Turbine at the Site | 33 |
6.0 Tower and Wind Turbine Generator Installation | 35 |
NOTICE: Use of the material contained in this document is subject to the warning on page Iv and the disclaimer on page v of this document.
DOC012R02 | AOC 15/50 User Manual | Nov 2001 |