ATM Routing

Switch Administration

2p›F Dotted lines in the diagrams below represent one-way routes to the devices pointed to by the arrowheads. Each route is defined on the device from which the dotted line originates.

A

LEC

Physical link

IISP route

IISP Domain

B

C

PNNI Domain

LECS

Figure 4-1 IISP route across PNNI domain

A second IISP device (Switch D) is added behind Switch A. If Switch D also needs to reach Switch C for LECS support, you must define additional IISP routes between Switches D and C, B and D, and A and D. Figure 4-2shows the typical “route to every point reached” IISP topology.

D

A

B

 

LEC

LEC

 

 

Physical link

C

 

 

 

IISP route

 

 

 

LECS

IISP Domain

PNNI Domain

Figure 4-2 Routes needed for a second IISP switch

4-4 SmartCell ZX-250 User Guide

Page 50
Image 50
Cabletron Systems ZX-250 manual Iisp route across Pnni domain