2 SWITCH INSTALLATION AND SETUP

After you read this chapter, you will be able to perform the following tasks:

UInitial installation of the switch

UComplete the initial configuration

UUse the console interface

UInstall the SmartSwitch ATM Administrator graphical management software

2.1UNPACKING THE SWITCH

Remove the accessory carton from the ZX-250 shipping box. Carefully remove the switch from its packing material.

2.2CHECK ACCESSORY CARTON CONTENTS

Open the accessory carton and check that it contains the following items:

7-foot UTP cable terminated on both ends with RJ-45 connectors

6-foot AC power cord (1 or 2 cords depending on switch model and options)

RJ-45 to 9-pin female adapter (labeled PC)

Console cabling instruction sheet

Diskettes containing switch software, MIB files, SmartCell ATM Administrator software, and release notes

Two rack-mount brackets

two-hole brackets for ZX-250

four-hole brackets for ZX-250r

Rack mount bracket screws

four #8-32 x 0.38 flat head screws for ZX-250

four #8-32 x 0.38 flat head screws, four #6-32 x 0.38 flat head screws for ZX-250r

SmartCell ZX-250 Release Notes

SmartCell ZX-250 User Guide

SmartCell 6A000/ZX-250 Reference Manual

2p›F If any of these items are missing, contact Cabletron customer support immediately.

SmartCell ZX-250 User Guide 2-1

Page 19
Image 19
Cabletron Systems ZX-250 manual Unpacking the Switch, Check Accessory Carton Contents