D-Link DES-3250TG Standalone Layer 2 Switch

Section 2

Unpacking and Setup

Unpacking

Installation

Power On

This chapter provides unpacking and setup information for the Switch.

Unpacking

Open the shipping carton of the Switch and carefully unpack its contents. The carton should contain the following items:

One DES-3250TG Standalone Layer 2 Switch

Mounting kit: 2 mounting brackets and screws

Four rubber feet with adhesive backing

One AC power cord

This User’s Guide with Registration Card

If any item is found missing or damaged, please contact your local D-Link reseller for replacement.

Installation

Use the following guidelines when choosing a place to install the Switch:

The surface must support at least 5 kg

The power outlet should be within 1.82 meters (6 feet) of the device

Visually inspect the power cord and see that it is secured to the AC power connector

Make sure that there is proper heat dissipation from and adequate ventilation around the switch. Do not place heavy objects on the switch

Desktop or Shelf Installation

When installing the Switch on a desktop or shelf, the rubber feet included with the device should first be attached. Attach these cushioning feet on the bottom at each corner of the device. Allow adequate space for ventilation between the device and the objects around it.

4

Page 14
Image 14
D-Link DES-3250TG manual Section Unpacking and Setup, Desktop or Shelf Installation, Unpacking Installation Power On