Site Preparation
2.0SITE PREPARATION
Site preparation for the Liebert FS is minimal. If a UPS system is already installed, the only require- ments are to properly:
• Place the unit in relation to walls, ceiling and other equipment and
• Fasten the unit to the floor.
! CAUTION
The following sections should be read thoroughly before proceeding with site preparation for installing the Liebert FS.
NOTE
All drawings referred to in this section are in Appendix D.0 - Installation Drawings.
2.1System Location
Choose a location for the Liebert FS that offers:
•Easy connection to inputs, outputs and auxiliary equipment
•Enough space to service the Liebert FS
•Air circulation sufficient to expel heat produced by Liebert FS
•Protection against moisture and excessive humidity (not to exceed 95%
•Protection against excessive dust and other particulate matter
•Compliance with fire prevention regulations and practices
•Operating environment temperature of
2.2Environmental Considerations
Place the system in a clean,
Adequate ventilation, including air conditioning if necessary, must be provided to limit heat accumu- lation. The ambient temperature for the unit must be from
There is a 32°F (0°C) minimum ambient temperature requirement for starting up the unit. Once the unit has been running for some time, it will keep itself warm enough in ambient temperatures as low as
Humidity is not to exceed 95%