UPS Interconnection Kits

Power and status/control wiring must be run in separate conduits or cable trays. Refer to Appendix D.0 - Installation Drawings for locations of the various electrical connections between Liebert FS system(s) and UPS system.

! CAUTION

Power and status/control wiring must be separated

Figure 95 Top view of Liebert FS Cabinet with UPS interconnection kit

 

Ground Terminal

DC Power

 

Terminals

 

Front

Rear

Fan Coil Module

 

Circuit

 

Breaker

 

Manufacturer’s

 

Connection

 

Status/Control

Terminal Block (upgraded)

! CAUTION

Do not cut entry holes for conduit while the access plates are still set on the top of the Liebert FS cabinet. Remove the access plates from the cable-access areas in the top of the Liebert FS cabinet prior to cutting entry holes.

! CAUTION

After reinstalling access plates, be certain that no foreign matter (metal shavings, insulation or wire fragments, etc.) remains inside the Liebert FS. Likewise, be certain to block any “extra holes” in the plates through which foreign matter (or rodents) could later enter the Liebert FS.