SUPREMA 2001 - OPERATION & SERVICE MANUAL
INSTALLING THE CARAFE TRAY, CUP STAND AND GRAPHICS BEZEL10.Install the carafe tray, cup stand and graphics bezel.
a)Install the carafe tray as illustrated below. Once done, install the cup stand on top of the carafe tray.
b)Install the bezel by first inserting the tabs on bottom if it into the notches on the door. Push the top of the bezel into the door until it clips in place.
◄
Install the carafe tray (and grill) and the cup stand (and grill).
►
Install the pre- assembled graphics (and pricing) bezel.
WATER CONNECTION11.Connect the water supply to the coffee maker.
a)Apply Teflon tape to a 3/8" plumbing fitting. If a 1/4" line is being used, you will then need a 1/4 x 3/8" fitting.
!Note:
For initial water connection at your shop, we recommend using 1/4" polytubing, and an instant (quick connect) fitting. This will simplify water
♦ Teflon tape should be applied in a clockwise direction, going with the threads when tightening.
b)Thread the fitting into the inlet valve at the back of the coffee maker and tighten with a wrench.
d)Connect the water line to the fitting.
e)Turn the water on at the source.
f)Plug the coffee maker into the wall outlet.
12.Switch the coffee maker "ON".
a)The main power switch is found on the back of the coffee maker.
b)When the power is switched "ON", you should hear the coffee maker filling with water.
c)Check the plumbing for leaks and correct them, if necessary.
d)Check the display for any messages, and take the indicated action.
13.Fill the ingredient dispenser with coffee.
a)Open the front door of the coffee maker.
b)Lift the lid on top of the coffee maker.
c)One section of the ingredient dispenser is larger than the other. The large section is for the coffee that is expected to have higher consumption. The smaller is for decaffeinated or lower consumption blends.
d)Fill the ingredient dispensers by pouring coffee through the opening in the lid.
Page 8 of 60 | July 6, 2001 | Suprema 2001 - Operation & Service |