Mounting

This section outlines the various mounting options available for the VNM Recorder.

zz Tower Installation

zz Rack Installation

Tower Installation

Attach the appropriate feet to the unit and place it in a well ventilated area. The tower can be placed on its side (horizontally) on a hard surface with the cover latch facing up or placed standing up (vertically) on a flat surface.

Rack Installation

This section provides information on installing the recorder into a rack cabinet. Rack installation requires the use of the rack mount kit, which is included with the VNM Recorder.

There are a variety of rack cabinets on the market, which may mean the assembly procedure will differ slightly. If necessary, refer to the instructions that came with the rack cabinet to complete the rack installation.

UL Guidelines for Rack Mounting

The following Underwriters Laboratories (UL) guidelines are relevant to the safe installation of these products in a rack:

1.Elevated operating ambient temperature — If the unit is installed in a closed or multi-unit rack assembly, the operating ambient temperature of the rack environment may be greater than room ambient temperature. Therefore, install the equipment in an environment compatible with the maximum ambient temperature (TMA: +122 °F, +50 °C) specified by Extron.

2.Reduced air flow — Install the equipment in the rack so that the equipment gets adequate air flow for safe operation.

3.Mechanical loading — Mount the equipment in the rack so that uneven mechanical loading does not create a hazardous condition.

4.Circuit overloading — Connect the equipment to the supply circuit and consider the effect that circuit overloading might have on overcurrent protection and supply wiring. Consider the equipment nameplate ratings when addressing this concern.

5.Reliable earthing (grounding) — Maintain reliable grounding of rack-mounted equipment. Pay particular attention to supply connections other than direct connections to the branch circuit (such as the use of power strips).

VNM Recorder • Mounting

72

Page 78
Image 78
Extron electronic 68-1998-01 REV. C manual Tower Installation, Rack Installation, UL Guidelines for Rack Mounting