ZKHTSS1 for 3/4" panels
Tubular Stainless Steel Handles
Step 3:
Install Standoffs onto Handles
Step 4:
Install
Handles
•Place a handle standoff on each attachment post along the handle. Position the screw hole on the standoff to point to the floor.
•Install set screws into the bottom of each standoff, using the Allen wrench provided. The standoff should be tight against the handle.
•Start mounting screws through the extrusion and just through the custom panel.
•Stand panels up on the hinge side and hold to access the appearance side. Place handle against mounting screws on the appearance side, drive top screw from the back of the extrusion partially into the standoff.
•Going down the handle, drive each screw partially into the standoff, alternating back to the top until the handle is tight against the door.
•Remove tape.
Screw
Allen Wrench
Screw
Step 5:
Install
Assembled
Panels
ZKHTSS1 | INSTALLATION |
It is best that 2 people perform this step.
•Place panel/handle assembly onto the bottom trim with support bracket tabs inserted into slots.
•Push and hold the panel back against the steel door with door handle extrusion flush to the handle side of the door.
•Reinstall original screws into the door extrusion.
•Open the door fully to stop.
•Install screws at the top, and hinge side.
•Follow the same procedure on the opposite door.
44