OnSite 2800 Series User Manual

2 • Hardware installation

 

 

Installation checklist

The installation checklist (see table 3) lists the tasks for installing an OnSite 2800 Series VPN Router. Make a copy of this checklist and mark the entries as you complete each task. For each OnSite 2800 Series VPN Router, include a copy of the completed checklist in your site log.

Table 3. Installation checklist

Task

Verified by

Date

 

 

 

Network information available & recorded in site log

 

 

 

 

 

Environmental specifications verified

 

 

 

 

 

Site power voltages verified

 

 

 

 

 

Installation site pre-power check completed

 

 

 

 

 

Required tools available

 

 

 

 

 

Additional equipment available

 

 

 

 

 

All printed documents available

 

 

 

 

 

OnSite release & build number verified

 

 

 

 

 

Rack, desktop, or wall mounting of chassis completed

 

 

 

 

 

Initial electrical connections established

 

 

 

 

 

ASCII terminal attached to console port

 

 

 

 

 

Cable length limits verified

 

 

 

 

 

Initial configuration performed

 

 

 

 

 

Initial operation verified

 

 

 

 

 

Planning the installation

28

Page 28
Image 28
Patton electronic 2800 user manual Installation checklist