Chapter 2 Installation and Setup

LRS-24Installation and Operation Manual

 

 

CM-1 Installation Procedure

To install CM-1:

Insert the CM-1 module into the CL slot, and fasten it with the two screws.

CM-2 Module

This section covers the installation of the CM-2 module in an LRS-24 enclosure.

Front Panel

A typical front panel for the CM-2 module is shown in Figure 2-6.The functions of the components located on the front panel are listed in Table 2-4.

POWER

TD

Power Indicator

Management Transmit Activity Indicator

RD

Management Receive

 

 

Activity Indicator

STAT/ADD

Status/Address

Display

CONTROL

R

S

2

3

2

CM-2

Figure 2-6. Module CM-2 Front Panel

2-12 Installation and Setup

Order from: Cutter Networks

Ph:727-398-5252/Fax:727-397-9610

www.bestdatasource.com

Page 40
Image 40