LRS-24 with CM-2 Module 1

Quick Start Guide

If you are familiar with LRS-24, use this guide to prepare it for operation. Choose
the section appropriate to the version of LRS-24 you are using.

1. LRS-24 with CM-1 Module

This section contains the startup instructions for LRS-24 with the CM-1 module.

Power-On

To turn the power on:
1. Set the ON/OFF switches on the panels of the LRSI-PSP** modules to ON.
2. Supply the DC power, as applicable.
To supply external phantom feed voltages:
1. Turn on LRS-24.
2. Turn on the source (for example, LRS-PS-FEED).

Normal Indications

PS Module(s): All the indicators on the panel(s) of the PS module(s) must light
in green to indicate proper operation.
CM-1 Module: The POWER indicator of the module must light. The TD and
RD indicators may flash (or may light steadily) when a management session is
in progress.
Order from: Cutter Networks
Ph:727-398-5252/Fax:727-397-9610
www.bestdatasource.com