4. Service procedures

(9) Items to Check Prior to Test Run

(1)Turn on the power supply switch more than 5 hours before in order to charge the crank case heater.

(2)Fully open the outdoor service valve after making the leak inspection of field connected tubing, vacuuming, and gas charging if necessary.

(3)Check the capacity code setting.

*The factory setting is as shown in the table. Double check it.

*The capacity code is set by S4 (green or blue, 4P DIP switch) on outdoor control PCB.

Outdoor control PCB

S4 (green or Blue) capacity code

(4P DIP switch)

ON

 

 

 

 

 

 

ON side

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

2

3

4

OFF side

 

 

 

 

 

 

 

 

 

2094_C_I

S4. Capacity code

No.

 

Outdoor PCB

 

 

 

 

 

 

Model No.

1

 

2

3

4

 

 

 

 

 

 

24 type

ON

 

ON

ON

OFF

 

 

 

 

 

 

36 type

OFF

 

ON

OFF

ON

 

 

 

 

 

 

48 type

ON

 

ON

OFF

ON

 

 

 

 

 

 

4

SM830082

IV - 39

Page 195
Image 195
Sanyo UH2442 / CH2442, XH3642 / CH3642, XH4242 / CH4242, XH2442 / CH2442 Service procedures Items to Check Prior to Test Run