63230-500-225A2

PowerLogicTM Series 800 Power Meter

3/2011

Index

stored log values 59

setup 22

medium priority alarms 47

power factor 37

megger testing 69

min/max conventions 28

memory

storage of 80

power meter memory 69

power meter

menu 11

accessories 5

meter information 26

described 1

metered values

firmware 7

demand readings 30

hardware 2

energy readings 35

initialization 23

real-time readings 27

instrumentation summary 1

minimum/maximum

models 5

password 18

reset 23

minimum/maximum values

setup 13

reset 24

with display

mode

parts 2, 4

reset 24

power quality problems 65

monitoring

predicted demand calculation 33

disturbance 65

problems

N

see troubleshooting 71

no priority alarms 47

protocols

nominal frequency

register addressing convention 79

EN50160 Evaluation 104

PT

nominal voltage

setup 16

4-wire systems 104

Q

EN50160 Evaluation 98, 104

quantities

non-volatile memory 99

used in alarm levels 54

nonvolatile memory 69

R

O

read registers 26

onboard alarm 96

readings

on-board logs 57

demand 30

operating time

real-time readings 27

reset 25

min/max values 28

operating time threshold

recording

set up 19

data in logs 60

operation 11

events in the event log 67

problems with the power meter 72

register list 79

using the command interface 83

register writes

outputs

EN50160 Evaluation 96

analog 44

registers

fixed pulse 43

addressing conventions 79

overvoltage alarm type 48

billing log 62

P

EN50160 Evaluation 95

password

configuration 99

default 13

portal 101

diagnostics 18

floating-point 79, 80

energy 18

for conditional energy 87

minimum/maximum 18

power factor format 80

setup 18

read 26

peak demand calculation 33

using the command interface 86

phase loss

write 26

alarm type for current 48

relay operating modes

alarm type for voltage 48

absolute kVARh pulse 41

phase reversal alarm type 48

absolute kWh pulse 41

phase rotation

end of demand interval 41

setup 19

kVAh pulse 41

pickups and dropouts

kVAR out pulse 42

scale factors 49

kVARh in pulse 41

setpoints 46

kWh in pulse 41

PLC

kWh out pulse 42

synchronizing demand with 32

latched 41

power analysis values 37, 38

normal 40

power demand configuration

timed 41

© 2011 Schneider Electric All Rights Reserved

111

Page 119
Image 119
Schneider Electric PM850, PM870, PM820, PM810 manual Plc, 111