PowerLogicTM Series 800 Power Meter

63230-500-225A2

Chapter 3—Operation

3/2011

PQ Advanced Evaluation Setup

1.Perform steps 1 through 5 of the SETUP MODE Access procedure on page 11.

2.Press ###: until ADVAN (advanced setup) is visible.

3.Press ADVAN.

4.Press ###: until PQADV is visible.

5.Press PQADV.

6.Select ON.

7.Press OK.

8.Change the nominal voltage (NOM V) value if desired (the default is 230).

9.Press OK to return to the SETUP MODE screen.

10.At the SETUP MODE screen, continue programming additional setup features or press1; until you are asked to save changes.

11.Press YES to save your changes and reset the power meter.

Power Demand Configuration Setup

1.Perform steps 1 through 5 of the SETUP MODE Access procedure on page 11.

2.Press ###: until ADVAN (advanced setup) is visible.

3.Press ADVAN.

4.Press ###: until DMD is visible.

5.Press DMD (P-DMD, I-DMD).

6.Select the demand configuration. Choices are

COMMS, RCOMM, CLOCK, RCLCK, IENGY, THERM, SLIDE, BLOCK, RBLCK, INPUT, and

RINPUT.

7.Press OK.

8.Enter the INTVL (interval) and press OK.

9.Enter the SUB-I (sub-interval) and press OK.

10.At the SETUP MODE screen, continue programming additional setup features or press1; until you are asked to save changes.

11.Press YES to save the changes.

PLSD110232

22

© 2011 Schneider Electric. All Rights Reserved.

Page 28
Image 28
Schneider Electric PM870, PM820, PM810, PM850 manual PQ Advanced Evaluation Setup, Power Demand Configuration Setup