Putting the conference system into operation

￿Slide the central unit with the mounted rack mount “ears” into the 19” rack and support the weight with e.g. a rack tray.

￿Secure the rack mount “ears” to the rack.

An engineering drawing detailing the dimensions of the central unit can be found in the appendix (see page 111).

Connecting the central unit to the mains

CAUTION Product damage due to unsuitable mains cables or power outlets!

An unsuitable power supply can damage the product.

￿Only use the recommended mains cable (see “Accessories” on page 108) for connecting the product to the mains.

￿Only use multi-outlet power strips or extension cables with protective ground contacts.

￿Only use mains cables with a 3-pin connector.

￿First connect the mains cable to the mains socket D.

￿Connect the mains cable to the mains.

The central unit is now ready for operation.

100-240V~ 50/60Hz 240W

D

Preparing the conference units for use

The conference units are ready for operation upon delivery. The conference system automatically recognizes if the connected conference units are chairman units or delegate units and initializes them automatically.

If you connect chairman units to the conference system during a running conference, you have to re-initialize them (see page 30 or page 88).