1. Items to confirm before starting up CC-Link system
n NOTE
The dedicated input of the STD.DIO connector provided on the controller will be disabled except for an interlock signal (DI 11). When the external 24V monitor control of system parameters is disabled, the interlock signal (DI 11) will also be disabled.
Confirm the following items before starting up the
|
| Confirmation details | Check |
|
|
| |
1 | Is the |
| |
| (Refer to Chapter 2 section 2 or 3.) |
| |
|
|
| |
|
|
| |
2 | Is the robot controller set to the |
| |
| (Refer to Chapter 2 section 1.) |
| |
|
|
| |
|
|
| |
3 | Are the |
| |
correctly set? | (Refer to Chapter 2 section 1.) |
| |
|
| ||
|
|
| |
4 | Is the ferrite core connected to the power input cable to the robot controller? |
| |
| (Refer to Chapter 2 section 4.) |
| |
|
|
| |
|
|
| |
5 | Is the |
| |
module? | (Refer to Chapter 2 section 5.) |
| |
|
| ||
|
|
| |
6 | Was the line test from the master station PLC correct? |
| |
| (Refer to the master station PLC instruction manual.) |
| |
|
|
| |
|
|
| |
7 | Is the master station PLC set for the |
| |
| (Refer to the master station PLC instruction manual.) |
| |
|
|
| |
|
|
| |
8 | Is the master station PLC exchanging the data for four stations? (The data for four |
| |
stations must always be exchanged.) |
| ||
|
| ||
|
|
| |
9 | Has the initial data process been carried out between the master station and robot |
| |
controller? | (Refer the initialization process in Chapter 3 section 2.) |
| |
|
| ||
|
|
| |
10 | Is the master station PLC judging that the robot controller is correctly functioning using |
| |
RX(n+7)8 (remote station Ready)? (Refer the samples in Chapter 5 section 4.) |
| ||
|
| ||
|
|
|
|