Chapter 2 Connection
Contents
1. | Confirming the | ||
2. | Setting to the | ||
| 2.1 | Saving the robot controller data | |
| 2.2 | Installing the | |
| 2.3 | Response when starting the robot controller | |
3. | Setting the | ||
| 3.1 | Setting the station No | |
| 3.2 | Setting the communication speed | |
4. | Noise measures | ||
| 4.1 | Mounting the ferrite core | |
5. | Connecting to the | ||
| 5.1 | Connecting to the cable terminal to the controller | |
| 5.2 | Testing the line from the master station PLC | |
6. | Parameter setting for | ||
| 6.1 | Parameter setting for |