American Power Conversion 250 A manual ATS Component Details, Motorized switches

Page 25

ATS Component Details

Motorized switches

 

 

The operating lever indicates the present

 

position of the motorized switch [OFF (),

 

 

TRIP, or ON ()]. This lever is also used

 

 

during manual operation of the switch (see

 

 

“Emergency Manual Operation” on page 22

 

 

for proper operating procedures).

 

 

The on/off selector allows the operator to

 

 

choose whether or not the motorized switch

 

 

controls the input switch. The selector should

 

 

only be used for the purpose of implementing

 

emergency manual operation (see page 21 for

more information).

 

 

Pressing the trip button immediately trips the

 

 

motorized switch. If this button is pressed

 

during automatic operation, the operating

 

lever will move to the OFF () position.

 

 

 

 

WARNING: Do not press this button while

 

 

load is connected!

When the motorized switch is in the OFF () position, attach a lock-out tag to the withdrawal prevention lock for added safety.

The operating lever key is used during manual operation of the motorized switch to assist in turning the operating lever. The key is provided in the hardware bag with the ATS.

Before operating the motorized switches, review “Emergency Manual Operation” on page 22. Failure to follow proper procedures could cause personal injury or

D A N G ER damage to the equipment.

InfraStruXure Power Generation System

15

Image 25
Contents Operation Page About This Manual How to find updates to this manualAudience Companion manualsPage Contents Display Interface Communication Configuration Customizing and Updating the ATS Specifications Page Cross-reference symbols used in this manual Safety symbols used in this manualOverview Wire sizing Total power off procedure InstallationOperating environment Page Overview InfraStruXure Power Generation SystemSystem Operates How the InfraStruXure Power GenerationGenerator cool-down Generator start sequenceOpen and closed transfers Fuel monitoring/runtime calculation Page Front view, door closed Smart Distribution Panel with ATS The automatic operation Control panel is used to set Front view, door openATS panel board, left side Installation Manual for instructionsATS panel board, right side ATS Component Details Motorized switchesUser connection plate Automatic operation control panelATS monitoring unit  When the EPO Arm/Test rocker is in the TestATS label kit Automatic Operation OperationAutomatic Operation Problem-loss of automatic operation Emergency Manual Operation Set the ATS Automatic Operation switch to Disable How to power the load from the generatorEmergency Manual Operation How to return to powering the load from utility Press Total Power Off Total Power Off Display Interface Top-level menu screen Top-level status screensNavigating through screens Password-protected screensPower Factor Total Load by PhaseLoad-Meter Total Load SummaryATS Position ATS/VoltageS1-Utility S2-Generator ATS Setup ATS/Voltage Generator Status GeneratorGen Output Adjust Operating SettingsManufacturer Data View Test Log TestingRun/View Test Test Duration Test ScheduleHow a test occurs Reset All ResetStats View Active Alarms AlarmsAlarm/Event Log Alarm SetupClearing latched alarms Alarm BeeperFuel Alarm Limits Other LimitsSystem Password ConfigSystem/Network Date/TimePage Factory Defaults Electrical ConfigFirmware Updates Reset 100% Fuel LevelPage Overview ATS Management OptionsInfraStruXure Manager Network management interfacesConnect the ATS to the InfraStruXure Manager Configuring the InfraStruXure ManagerConnect the ATS to your network Configuring the ATS Network Management InterfaceTCP/IP configuration methods Configuration overviewDevice IP Configuration Wizard Bootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Remote access to the control console Local access to the control consoleChoose Network from the Control Console menu Control consoleWeb interface How to Access the ATS Network Management InterfaceSnmp Telnet and SSHFTP and SCP InfraStruXure Power Generation System Customizing and Updating the ATS How to connect contacts to the user interface board EPO Test NC no How to Connect an EPO Switch to the ATSContact Closure-Normally Open Problem Action Safety warnings How to Allow Easy Access to the ATS Display Interface Part Number Description Height on Panel Output distribution circuit breakers available from APCCircuit breaker adapter modules available from APC Determine the configuration of the panelCombination #1 Allowed circuit breaker combinationsCombination #6 T1 three-pole breaker requires no additional preparation Preparing the breakers for installationT1 three-pole breaker assembly Parts and tools needed for installation proceduresInstalling breakers on the ATS panel bus See also From a local computer How to Download Firmware UpdatesPhysical ElectricalAWG Installation and Wiring 208V 480VCompliance EnvironmentalPage If Source 2 is a Second Utility Appendix Custom InstallationsInfraStruXure Power Generation System Index InfraStruXure Power Generation System InfraStruXure Power Generation System Page Page Page Radio Frequency Interference 990-1845C