American Power Conversion 250 A manual Index

Page 93

Index

A

Access panel, on panel board, 1314

Accessing the display interface, 67 Agency approvals, 79

Alarm beeper, 44 Alarm LED, 29 Alarm/event log, 43 Alarms

clearing latched, 44 configuring limits, 4344 viewing active, 43

Alarms screen, 4344 Allow closed setting, 8 Arm/Test rocker switch, 17 Armed LED, 17

ATS product description, 1114 ATS/Voltage screen, 3336 Automatic operation, 1921

loss of, 21

placing the generator system in to, 19

resetting on the ATS generator, 20

Automatic operation control panel, 12, 16

Automatic operation switch, 16

B

Bad line quality, 6 BOOTP configuration, 53

Bottom access panel, location of, 11

Buttons (navigational/operational) on display interface, 29

C

Check log LED, 29 Circuit board port, 17

Circuit breaker panel, determining configuration of, 69

Circuit breakers, 6875 adapter modules, 69 available from APC, 68 combinations of, 70

installing on the ATS panel board, 74

preparing for installation, 72 tools needed for installation, 73

Closed transfers, 8

Communication converter, location of, 13

Compatible ATS equipment, 5 Compliance, 79 Components, of the ATS, 1518 Config screen, 4547 Configuration

electrical, 47

of ATS communication, 4960 of contacts and relays, 46

of system and network, 45 of the EPO switch, 63

Console port, 17

Control console, local and remote access to, 5556

Coolant temperature limit, 7 Cool-down period, of generator, 7 Crank cycles, 7

Crank setting, 7 Crank time, 7

Custom installations, 81-82 Customizing the ATS, 6175

D

Dead front, description, 12 Dead front source label, 18 DHCP configuration, 54 DIP switches, 17 Display interface, 2947

location of, 12

navigating through screens, 31 obtaining easy access to, 67 screens, 3247

top-level screens, 30 Display port, 17

E

Electrical configuration, 47 Electrical specifications, 77 Elevation, for operation, 3 Emergency manual operation, 22

powering the load from the generator, 2324

returning to powering the load from utility mains, 2526

Emergency Power Off Arm/Test rocker switch, 17

connecting the switch to the ATS, 6366

contacts port, location of, 17 DIP switches, 17

safety warnings, 66 where connected, 16 Emissions verifications, 79

Engine start test, 39 Environment, for operation, 3 Environmental specifications, 79 EPO contacts port, location of, 17 EPO. See Emergency Power Off.

Equipment, compatible with the ATS, 5

Ethernet port, on user connection plate, 16

F

Factory defaults, resetting the, 47

Firmware updates, how to download, 76

Front bezel label, 18 Front door, description, 11 Front view

door closed, 11 door open, 12

FTP, for transferring new firmware to the ATS, 59

Fuel monitoring, 9

Fuel status, where displayed, 37 Fuse block, on panel board, 13

G

Generator label, 18

InfraStruXure Power Generation System

83

Image 93
Contents Operation Page About This Manual How to find updates to this manualAudience Companion manualsPage Contents Display Interface Communication Configuration Customizing and Updating the ATS Specifications Page Safety symbols used in this manual Cross-reference symbols used in this manualOverview Wire sizing Installation Total power off procedureOperating environment Page Overview InfraStruXure Power Generation SystemSystem Operates How the InfraStruXure Power GenerationGenerator cool-down Generator start sequenceOpen and closed transfers Fuel monitoring/runtime calculation Page Front view, door closed Smart Distribution Panel with ATS The automatic operation Control panel is used to set Front view, door openATS panel board, left side Installation Manual for instructionsATS panel board, right side ATS Component Details Motorized switchesUser connection plate Automatic operation control panelATS monitoring unit  When the EPO Arm/Test rocker is in the TestATS label kit Automatic Operation OperationAutomatic Operation Problem-loss of automatic operation Emergency Manual Operation Set the ATS Automatic Operation switch to Disable How to power the load from the generatorEmergency Manual Operation How to return to powering the load from utility Press Total Power Off Total Power Off Display Interface Top-level menu screen Top-level status screensNavigating through screens Password-protected screensPower Factor Total Load by PhaseLoad-Meter Total Load SummaryATS/Voltage ATS PositionS1-Utility S2-Generator ATS Setup ATS/Voltage Generator Status GeneratorOperating Settings Gen Output AdjustManufacturer Data Testing View Test LogRun/View Test Test Duration Test ScheduleHow a test occurs Reset Reset AllStats View Active Alarms AlarmsAlarm/Event Log Alarm SetupClearing latched alarms Alarm BeeperFuel Alarm Limits Other LimitsSystem Password ConfigSystem/Network Date/TimePage Factory Defaults Electrical ConfigFirmware Updates Reset 100% Fuel LevelPage Overview ATS Management OptionsInfraStruXure Manager Network management interfacesConnect the ATS to the InfraStruXure Manager Configuring the InfraStruXure ManagerConnect the ATS to your network Configuring the ATS Network Management InterfaceConfiguration overview TCP/IP configuration methodsDevice IP Configuration Wizard Bootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Remote access to the control console Local access to the control consoleChoose Network from the Control Console menu Control consoleWeb interface How to Access the ATS Network Management InterfaceSnmp Telnet and SSHFTP and SCP InfraStruXure Power Generation System Customizing and Updating the ATS How to connect contacts to the user interface board EPO Test NC no How to Connect an EPO Switch to the ATSContact Closure-Normally Open Problem Action Safety warnings How to Allow Easy Access to the ATS Display Interface Part Number Description Height on Panel Output distribution circuit breakers available from APCCircuit breaker adapter modules available from APC Determine the configuration of the panelCombination #1 Allowed circuit breaker combinationsCombination #6 T1 three-pole breaker requires no additional preparation Preparing the breakers for installationT1 three-pole breaker assembly Parts and tools needed for installation proceduresInstalling breakers on the ATS panel bus See also From a local computer How to Download Firmware UpdatesPhysical ElectricalAWG Installation and Wiring 208V 480VCompliance EnvironmentalPage If Source 2 is a Second Utility Appendix Custom InstallationsInfraStruXure Power Generation System Index InfraStruXure Power Generation System InfraStruXure Power Generation System Page Page Page Radio Frequency Interference 990-1845C