About This Manual

Audience

This manual is intended for users of the InfraStruXure™ Smart Distribution Panel with Automatic Transfer Switch (ATS). It provides important safety warnings and instructions, an overview of the ATS components, a detailed discussion about the ATS display interface, instructions on how to add components to the ATS, and technical specifications.

Companion manuals

For additional information about your InfraStruXure Power Generation System, refer to the following sheets and manuals. The initial part numbers are listed below. Be aware that some of the documentation may have undergone one or more revisions (A, B, etc.):

ATS Unpacking Sheet (990-1842)

Electrical Installation Manual (990-1844)

Generator Reference Manual (990-1846)

Network Management Interface User’s Guide (available on the APC Web site or the Utility CD) (990-1993)

How to find updates to this manual

You can check for updates to this manual by clicking on the User Manuals link on the Support page of the APC Web site (www.apc.com). Choose Power Generation and then InfraStruXure Power Generation. From the list of InfraStruXure Power Generation manuals, look for the latest letter revision (A, B, etc.) of the initial part number appearing on the back cover of this manual (990-1845).

InfraStruXure Power Generation System

i

Image 3
Contents Operation Page Companion manuals How to find updates to this manualAbout This Manual AudiencePage Contents Display Interface Communication Configuration Customizing and Updating the ATS Specifications Page Safety symbols used in this manual Cross-reference symbols used in this manualOverview Wire sizing Installation Total power off procedureOperating environment Page Overview InfraStruXure Power Generation SystemSystem Operates How the InfraStruXure Power GenerationGenerator cool-down Generator start sequenceOpen and closed transfers Fuel monitoring/runtime calculation Page Front view, door closed Smart Distribution Panel with ATS The automatic operation Control panel is used to set Front view, door openATS panel board, left side Installation Manual for instructionsATS panel board, right side ATS Component Details Motorized switchesUser connection plate Automatic operation control panelATS monitoring unit  When the EPO Arm/Test rocker is in the TestATS label kit Automatic Operation OperationAutomatic Operation Problem-loss of automatic operation Emergency Manual Operation Set the ATS Automatic Operation switch to Disable How to power the load from the generatorEmergency Manual Operation How to return to powering the load from utility Press Total Power Off Total Power Off Display Interface Top-level menu screen Top-level status screensNavigating through screens Password-protected screensTotal Load Summary Total Load by PhasePower Factor Load-MeterATS/Voltage ATS PositionS1-Utility S2-Generator ATS Setup ATS/Voltage Generator Status GeneratorOperating Settings Gen Output AdjustManufacturer Data Testing View Test LogRun/View Test Test Duration Test ScheduleHow a test occurs Reset Reset AllStats Alarm Setup AlarmsView Active Alarms Alarm/Event LogOther Limits Alarm BeeperClearing latched alarms Fuel Alarm LimitsDate/Time ConfigSystem Password System/NetworkPage Reset 100% Fuel Level Electrical ConfigFactory Defaults Firmware UpdatesPage Network management interfaces ATS Management OptionsOverview InfraStruXure ManagerConnect the ATS to the InfraStruXure Manager Configuring the InfraStruXure ManagerConnect the ATS to your network Configuring the ATS Network Management InterfaceConfiguration overview TCP/IP configuration methodsDevice IP Configuration Wizard Bootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Remote access to the control console Local access to the control consoleChoose Network from the Control Console menu Control consoleWeb interface How to Access the ATS Network Management InterfaceSnmp Telnet and SSHFTP and SCP InfraStruXure Power Generation System Customizing and Updating the ATS How to connect contacts to the user interface board EPO Test NC no How to Connect an EPO Switch to the ATSContact Closure-Normally Open Problem Action Safety warnings How to Allow Easy Access to the ATS Display Interface Part Number Description Height on Panel Output distribution circuit breakers available from APCCircuit breaker adapter modules available from APC Determine the configuration of the panelCombination #1 Allowed circuit breaker combinationsCombination #6 T1 three-pole breaker requires no additional preparation Preparing the breakers for installationT1 three-pole breaker assembly Parts and tools needed for installation proceduresInstalling breakers on the ATS panel bus See also From a local computer How to Download Firmware UpdatesPhysical ElectricalAWG Installation and Wiring 208V 480VCompliance EnvironmentalPage If Source 2 is a Second Utility Appendix Custom InstallationsInfraStruXure Power Generation System Index InfraStruXure Power Generation System InfraStruXure Power Generation System Page Page Page Radio Frequency Interference 990-1845C