American Power Conversion 250 A manual Top-level status screens, Top-level menu screen

Page 40

Overview

Top-level status screens

After system start-up, a brief introduction screen is displayed and then the display interface scrolls automatically and continuously through five screens of basic status information. Press the Up or Down arrows to interrupt automatic scrolling and view a specific status screen.

Source: S1-Utility

S1: Ok S2: OFF

Fuel: xxx%

Runtime: 1 day 12 hr

Total Output Loading

kW: 000

PF: 000

kVA: 000

%LD: xxx

Freq: 000

 

Volts-Out

Volts-Sx

L1-2: xxx

L1-2: xxx

L2-3: xxx

L2-3: xxx

L3-1: xxx

L3-1: xxx

Load Current:

L1: 000 Neut:000

L2: 000

L3: 000

No Active Alarms

System Date/Time:

Jun-24 2004 07:58

If you have scheduled one or more tests, the display interface shows the scheduled test screen (below) each time a self-test commences. To cancel an ongoing self-test, press ENTER when the selector arrow rests on the ABORT NOW? option.

Scheduled test will start in xxx sec.

ABORT NOW?

Top-level menu screen

Press ENTER to open any of the following top-level menu screens:

 

 

 

 

 

 

Load-Meter

Stats

 

 

ATS/Voltage

Alarms

 

 

Generator

Config

 

 

Testing

Help

 

 

 

 

If the display interface is inactive for the time specified in the Time-outsetting, it will revert to the initial basic monitoring screens.

Note

For descriptions of the top-level menu choices, see the sections devoted to each top- level menu starting on page 32.

30

InfraStruXure Power Generation System

Image 40
Contents Operation Page How to find updates to this manual About This ManualAudience Companion manualsPage Contents Display Interface Communication Configuration Customizing and Updating the ATS Specifications Page Cross-reference symbols used in this manual Safety symbols used in this manualOverview Wire sizing Total power off procedure InstallationOperating environment Page InfraStruXure Power Generation System OverviewHow the InfraStruXure Power Generation System OperatesGenerator start sequence Generator cool-downOpen and closed transfers Fuel monitoring/runtime calculation Page Smart Distribution Panel with ATS Front view, door closedFront view, door open  The automatic operation Control panel is used to setInstallation Manual for instructions ATS panel board, left sideATS panel board, right side Motorized switches ATS Component DetailsAutomatic operation control panel User connection plate When the EPO Arm/Test rocker is in the Test ATS monitoring unitATS label kit Operation Automatic OperationAutomatic Operation Problem-loss of automatic operation Emergency Manual Operation How to power the load from the generator Set the ATS Automatic Operation switch to DisableEmergency Manual Operation How to return to powering the load from utility Press Total Power Off Total Power Off Display Interface Top-level status screens Top-level menu screenPassword-protected screens Navigating through screensTotal Load by Phase Power FactorLoad-Meter Total Load SummaryATS Position ATS/VoltageS1-Utility S2-Generator ATS Setup ATS/Voltage Generator Generator StatusGen Output Adjust Operating SettingsManufacturer Data View Test Log TestingRun/View Test Test Schedule Test DurationHow a test occurs Reset All ResetStats Alarms View Active AlarmsAlarm/Event Log Alarm SetupAlarm Beeper Clearing latched alarmsFuel Alarm Limits Other LimitsConfig System PasswordSystem/Network Date/TimePage Electrical Config Factory DefaultsFirmware Updates Reset 100% Fuel LevelPage ATS Management Options OverviewInfraStruXure Manager Network management interfacesConfiguring the InfraStruXure Manager Connect the ATS to the InfraStruXure ManagerConfiguring the ATS Network Management Interface Connect the ATS to your networkTCP/IP configuration methods Configuration overviewDevice IP Configuration Wizard Bootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Local access to the control console Remote access to the control consoleControl console Choose Network from the Control Console menuHow to Access the ATS Network Management Interface Web interfaceTelnet and SSH SnmpFTP and SCP InfraStruXure Power Generation System Customizing and Updating the ATS How to connect contacts to the user interface board How to Connect an EPO Switch to the ATS EPO Test NC noContact Closure-Normally Open Problem Action Safety warnings How to Allow Easy Access to the ATS Display Interface Output distribution circuit breakers available from APC Part Number Description Height on PanelDetermine the configuration of the panel Circuit breaker adapter modules available from APCAllowed circuit breaker combinations Combination #1Combination #6 Preparing the breakers for installation T1 three-pole breaker requires no additional preparationParts and tools needed for installation procedures T1 three-pole breaker assemblyInstalling breakers on the ATS panel bus See also How to Download Firmware Updates From a local computerElectrical PhysicalInstallation and Wiring 208V 480V AWGEnvironmental CompliancePage Appendix Custom Installations If Source 2 is a Second UtilityInfraStruXure Power Generation System Index InfraStruXure Power Generation System InfraStruXure Power Generation System Page Page Page Radio Frequency Interference 990-1845C