Overview
Top-level status screens
After system
Source:
S1: Ok S2: OFF
Fuel: xxx%
Runtime: 1 day 12 hr
Total Output Loading
kW: 000 | PF: 000 |
kVA: 000 | %LD: xxx |
Freq: 000 |
|
Load Current:
L1: 000 Neut:000
L2: 000
L3: 000
No Active Alarms
System Date/Time:
If you have scheduled one or more tests, the display interface shows the scheduled test screen (below) each time a
Scheduled test will start in xxx sec.
ABORT NOW?
Top-level menu screen
Press ENTER to open any of the following
|
|
|
|
|
| Stats | |
|
| ATS/Voltage | Alarms |
|
| Generator | Config |
|
| Testing | Help |
|
|
|
|
If the display interface is inactive for the time specified in the
Note
For descriptions of the
30 | InfraStruXure Power Generation System |