American Power Conversion 250 A manual Test Schedule, Test Duration

Page 50

Testing

Test Schedule

Use this menu to schedule a test in the future.

Define Schedule Set the test schedule by changing the following parameters:

Gen Start: Choose when to perform a generator start test. Choices are Never, Monthly, Weekly, or Daily.

Day: The choices for Day depend on the choice made for Gen Start:

Gen Start: Monthly

Day: 1st Monday

Time: 14:30

Load Test: Monthly

If you chose a GenStart of Never: The Day is not configurable.

If you chose a GenStart of Monthly: Choose to perform the test on the 1st, 2nd, 3rd, or 4th week of the month on a specific day of the week.

If you chose a GenStart of Weekly: Choose to perform the test on any day of the week.

If you chose a GenStart of Daily: Choose to perform the test Everyday, on Weekdays (Monday through Friday), or on Weekends (Saturday and Sunday).

Time: Set the time of day the test will run. The time is set on a 24-hour clock.

Load Test: Choose to test the generator with the data center load applied. Choose to perform the load test By Month, Monthly, Never, or All.

Choosing Monthly for the Load Test ensures this test will take place on the first occurrence of the Gen Start Test.

Next Test

Lists the date and time of the next test.

Test Duration

The following items are available on this menu:

Warm Up

Set the amount of time, in seconds (up to 999), that the generator will warm up

 

during a test.

Loaded

If the Load Test option is selected, set the amount of time, in minutes (up to 999),

 

that the generator will run with the data center load applied.

Cooldown

Set the amount of time, in seconds (up to 999), that the generator will cool down

 

after the test.

40

InfraStruXure Power Generation System

Image 50
Contents Operation Page Audience How to find updates to this manualAbout This Manual Companion manualsPage Contents Display Interface Communication Configuration Customizing and Updating the ATS Specifications Page Overview Safety symbols used in this manualCross-reference symbols used in this manual Wire sizing Operating environment InstallationTotal power off procedure Page InfraStruXure Power Generation System OverviewHow the InfraStruXure Power Generation System OperatesGenerator start sequence Generator cool-downOpen and closed transfers Fuel monitoring/runtime calculation Page Smart Distribution Panel with ATS Front view, door closedFront view, door open  The automatic operation Control panel is used to setInstallation Manual for instructions ATS panel board, left sideATS panel board, right side Motorized switches ATS Component DetailsAutomatic operation control panel User connection plate When the EPO Arm/Test rocker is in the Test ATS monitoring unitATS label kit Operation Automatic OperationAutomatic Operation Problem-loss of automatic operation Emergency Manual Operation How to power the load from the generator Set the ATS Automatic Operation switch to DisableEmergency Manual Operation How to return to powering the load from utility Press Total Power Off Total Power Off Display Interface Top-level status screens Top-level menu screenPassword-protected screens Navigating through screensLoad-Meter Total Load by PhasePower Factor Total Load SummaryS1-Utility ATS/VoltageATS Position S2-Generator ATS Setup ATS/Voltage Generator Generator StatusManufacturer Data Operating SettingsGen Output Adjust Run/View Test TestingView Test Log Test Schedule Test DurationHow a test occurs Stats ResetReset All Alarm/Event Log AlarmsView Active Alarms Alarm SetupFuel Alarm Limits Alarm BeeperClearing latched alarms Other LimitsSystem/Network ConfigSystem Password Date/TimePage Firmware Updates Electrical ConfigFactory Defaults Reset 100% Fuel LevelPage InfraStruXure Manager ATS Management OptionsOverview Network management interfacesConfiguring the InfraStruXure Manager Connect the ATS to the InfraStruXure ManagerConfiguring the ATS Network Management Interface Connect the ATS to your networkDevice IP Configuration Wizard Configuration overviewTCP/IP configuration methods Bootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Local access to the control console Remote access to the control consoleControl console Choose Network from the Control Console menuHow to Access the ATS Network Management Interface Web interfaceTelnet and SSH SnmpFTP and SCP InfraStruXure Power Generation System Customizing and Updating the ATS How to connect contacts to the user interface board How to Connect an EPO Switch to the ATS EPO Test NC noContact Closure-Normally Open Problem Action Safety warnings How to Allow Easy Access to the ATS Display Interface Output distribution circuit breakers available from APC Part Number Description Height on PanelDetermine the configuration of the panel Circuit breaker adapter modules available from APCAllowed circuit breaker combinations Combination #1Combination #6 Preparing the breakers for installation T1 three-pole breaker requires no additional preparationParts and tools needed for installation procedures T1 three-pole breaker assemblyInstalling breakers on the ATS panel bus See also How to Download Firmware Updates From a local computerElectrical PhysicalInstallation and Wiring 208V 480V AWGEnvironmental CompliancePage Appendix Custom Installations If Source 2 is a Second UtilityInfraStruXure Power Generation System Index InfraStruXure Power Generation System InfraStruXure Power Generation System Page Page Page Radio Frequency Interference 990-1845C