Smart Distribution Panel with ATS
ATS panel board, right side
The Source 1 input switch accepts input wires from the utility (refer to the Electrical Installation Manual for connection instructions).
WARNING: Only a certified electrician should connect utility power to the ATS!
Behind this access panel are the Source 1 volt- sensing circuit board and the distribution panel
The Source 1 current transformers monitor the input current of each incoming phase from the utility. The data gathered from these transformers is displayed on the Total Load by Phase screen, which is accessed through the Load Meter menu on the display interface.
Behind this access panel is the Source 2 volt- sensing circuit board. Use a Phillips or standard screwdriver to remove the panel.
The Source 2 control transformer outputs 120 VAC and 18 VAC to the Source 2 motorized switch after stepping down the 480 V or 208 V input.
The Source 2 fuse block regulates input to the Source 2 control transformer for subsequent powering of the Source 2 motorized switch.
14 | InfraStruXure Power Generation System |