American Power Conversion 250 A manual Automatic operation control panel, User connection plate

Page 26

ATS Component Details

Automatic operation control panel

For more detailed information concerning Automatic Operation of the InfraStruXure Power Generation System, see “Automatic Operation” on page 19.

The Not in Automatic Operation

LED is lit when the ATS is NOT in automatic operation. This typically occurs when the automatic operation switch is set to Disable. In rare instances, the

Not in Automatic Operation

LED will be lit when the automatic operation switch is in the Enable position (see page 21 for more information).

Use the Automatic Operation switch to select whether the generator should automatically turn on after a loss of power.

User connection plate

For location and description of the user connection plate, see number 2 on page 11. For clarity, the plate is shown facing upwards, as opposed to its factory-installed downward-facing position. The user interface board, the primary component on the plate, accepts most connections described below.

Connect the ATS to either the network or the InfraStruXure Manager through the surge-protected ethernet port. This port protects your network connection from power surges.

The user interface board has four input contact connections for monitoring Normally Open (NO) or Normally Closed (NC) dry contacts (see page 46 and page 61 for more information).

The user interface board has four relay output connections to accommodate NO or NC dry contacts (see page 46 and page 61 for more information).

Connect an Emergency Power-Off switch at one of the three EPO connection choices: 24 VDC, 24 VAC, or contact closure (see page 63 for more information).

16

InfraStruXure Power Generation System

Image 26
Contents Operation Page Audience How to find updates to this manualAbout This Manual Companion manualsPage Contents Display Interface Communication Configuration Customizing and Updating the ATS Specifications Page Overview Safety symbols used in this manualCross-reference symbols used in this manual Wire sizing Operating environment InstallationTotal power off procedure Page InfraStruXure Power Generation System OverviewHow the InfraStruXure Power Generation System OperatesGenerator start sequence Generator cool-downOpen and closed transfers Fuel monitoring/runtime calculation Page Smart Distribution Panel with ATS Front view, door closedFront view, door open  The automatic operation Control panel is used to setInstallation Manual for instructions ATS panel board, left sideATS panel board, right side Motorized switches ATS Component DetailsAutomatic operation control panel User connection plate When the EPO Arm/Test rocker is in the Test ATS monitoring unitATS label kit Operation Automatic OperationAutomatic Operation Problem-loss of automatic operation Emergency Manual Operation How to power the load from the generator Set the ATS Automatic Operation switch to DisableEmergency Manual Operation How to return to powering the load from utility Press Total Power Off Total Power Off Display Interface Top-level status screens Top-level menu screenPassword-protected screens Navigating through screensLoad-Meter Total Load by PhasePower Factor Total Load SummaryS1-Utility ATS/VoltageATS Position S2-Generator ATS Setup ATS/Voltage Generator Generator StatusManufacturer Data Operating SettingsGen Output Adjust Run/View Test TestingView Test Log Test Schedule Test DurationHow a test occurs Stats ResetReset All Alarm/Event Log AlarmsView Active Alarms Alarm SetupFuel Alarm Limits Alarm BeeperClearing latched alarms Other LimitsSystem/Network ConfigSystem Password Date/TimePage Firmware Updates Electrical ConfigFactory Defaults Reset 100% Fuel LevelPage InfraStruXure Manager ATS Management OptionsOverview Network management interfacesConfiguring the InfraStruXure Manager Connect the ATS to the InfraStruXure ManagerConfiguring the ATS Network Management Interface Connect the ATS to your networkDevice IP Configuration Wizard Configuration overviewTCP/IP configuration methods Bootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Local access to the control console Remote access to the control consoleControl console Choose Network from the Control Console menuHow to Access the ATS Network Management Interface Web interfaceTelnet and SSH SnmpFTP and SCP InfraStruXure Power Generation System Customizing and Updating the ATS How to connect contacts to the user interface board How to Connect an EPO Switch to the ATS EPO Test NC noContact Closure-Normally Open Problem Action Safety warnings How to Allow Easy Access to the ATS Display Interface Output distribution circuit breakers available from APC Part Number Description Height on PanelDetermine the configuration of the panel Circuit breaker adapter modules available from APCAllowed circuit breaker combinations Combination #1Combination #6 Preparing the breakers for installation T1 three-pole breaker requires no additional preparationParts and tools needed for installation procedures T1 three-pole breaker assemblyInstalling breakers on the ATS panel bus See also How to Download Firmware Updates From a local computerElectrical PhysicalInstallation and Wiring 208V 480V AWGEnvironmental CompliancePage Appendix Custom Installations If Source 2 is a Second UtilityInfraStruXure Power Generation System Index InfraStruXure Power Generation System InfraStruXure Power Generation System Page Page Page Radio Frequency Interference 990-1845C