American Power Conversion 250 A manual Output distribution circuit breakers available from APC

Page 78

How to Add Sub-Feed Output Distribution Circuit Breakers to the ATS

The ATS panel bus must be completely de-energized before adding breakers!

Electrical

Hazard

Output distribution circuit breakers available from APC

Part Number

Description

Height on Panel

 

 

 

PG1P15AT1B

15A, single-pole breaker, T1 frame

1.00in/25.4mm

PG1P20AT1B

20A, single-pole breaker, T1 frame

1.00in/25.4mm

PG1P25AT1B

25A, single-pole breaker, T1 frame

1.00in/25.4mm

PG1P30AT1B

30A, single-pole breaker, T1 frame

1.00in/25.4mm

PG3P15AT1B

15A, three-pole breaker, T1 frame

3.00 in/76.2mm

PG3P20AT1B

20A, three-pole breaker, T1 frame

3.00 in/76.2mm

PG3P25AT1B

25A, three-pole breaker, T1 frame

3.00 in/76.2mm

PG3P30AT1B

30A, three-pole breaker, T1 frame

3.00 in/76.2mm

PG3P40AT1B

40A, three-pole breaker, T1 frame

3.00 in/76.2mm

PG3P50AT1B

50A, three-pole breaker, T1 frame

3.00 in/76.2mm

PG3P60AT1B

60A, three-pole breaker, T1 frame

3.00 in/76.2mm

PG3P70AT1B

70A, three-pole breaker, T1 frame

3.00 in/76.2mm

PG3P80AT1B

80A, three-pole breaker, T1 frame

3.00 in/76.2mm

PG3P90AT1B

90A, three-pole breaker, T1 frame

3.00 in/76.2mm

PG3P100AT1B

100A, three-pole breaker, T1 frame

3.00 in/76.2mm

PG3P125AT3B

125A, three-pole breaker, T3 frame

4.13in/104.9mm

PG3P150AT3B

150A, three-pole breaker, T3 frame

4.13in/104.9mm

PG3P175AT3B

175A, three-pole breaker, T3 frame

4.13in/104.9mm

PG3P200AT3B

200A, three-pole breaker, T3 frame

4.13in/104.9mm

PG3P225AT3B

225A, three-pole breaker, T3 frame

4.13in/104.9mm

 

 

 

Circuit breaker adapter modules are required when mounting breakers onto the panel bus in the ATS. Refer to “Circuit breaker adapter modules available from APC” on page 69.

Note

68

InfraStruXure Power Generation System

Image 78
Contents Operation Page Audience How to find updates to this manualAbout This Manual Companion manualsPage Contents Display Interface Communication Configuration Customizing and Updating the ATS Specifications Page Safety symbols used in this manual Cross-reference symbols used in this manualOverview Wire sizing Installation Total power off procedureOperating environment Page InfraStruXure Power Generation System OverviewHow the InfraStruXure Power Generation System OperatesGenerator start sequence Generator cool-downOpen and closed transfers Fuel monitoring/runtime calculation Page Smart Distribution Panel with ATS Front view, door closedFront view, door open  The automatic operation Control panel is used to setInstallation Manual for instructions ATS panel board, left sideATS panel board, right side Motorized switches ATS Component DetailsAutomatic operation control panel User connection plate When the EPO Arm/Test rocker is in the Test ATS monitoring unitATS label kit Operation Automatic OperationAutomatic Operation Problem-loss of automatic operation Emergency Manual Operation How to power the load from the generator Set the ATS Automatic Operation switch to DisableEmergency Manual Operation How to return to powering the load from utility Press Total Power Off Total Power Off Display Interface Top-level status screens Top-level menu screenPassword-protected screens Navigating through screensLoad-Meter Total Load by PhasePower Factor Total Load SummaryATS/Voltage ATS PositionS1-Utility S2-Generator ATS Setup ATS/Voltage Generator Generator StatusOperating Settings Gen Output AdjustManufacturer Data Testing View Test LogRun/View Test Test Schedule Test DurationHow a test occurs Reset Reset AllStats Alarm/Event Log AlarmsView Active Alarms Alarm SetupFuel Alarm Limits Alarm BeeperClearing latched alarms Other LimitsSystem/Network ConfigSystem Password Date/TimePage Firmware Updates Electrical ConfigFactory Defaults Reset 100% Fuel LevelPage InfraStruXure Manager ATS Management OptionsOverview Network management interfacesConfiguring the InfraStruXure Manager Connect the ATS to the InfraStruXure ManagerConfiguring the ATS Network Management Interface Connect the ATS to your networkConfiguration overview TCP/IP configuration methodsDevice IP Configuration Wizard Bootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Local access to the control console Remote access to the control consoleControl console Choose Network from the Control Console menuHow to Access the ATS Network Management Interface Web interfaceTelnet and SSH SnmpFTP and SCP InfraStruXure Power Generation System Customizing and Updating the ATS How to connect contacts to the user interface board How to Connect an EPO Switch to the ATS EPO Test NC noContact Closure-Normally Open Problem Action Safety warnings How to Allow Easy Access to the ATS Display Interface Output distribution circuit breakers available from APC Part Number Description Height on PanelDetermine the configuration of the panel Circuit breaker adapter modules available from APCAllowed circuit breaker combinations Combination #1Combination #6 Preparing the breakers for installation T1 three-pole breaker requires no additional preparationParts and tools needed for installation procedures T1 three-pole breaker assemblyInstalling breakers on the ATS panel bus See also How to Download Firmware Updates From a local computerElectrical PhysicalInstallation and Wiring 208V 480V AWGEnvironmental CompliancePage Appendix Custom Installations If Source 2 is a Second UtilityInfraStruXure Power Generation System Index InfraStruXure Power Generation System InfraStruXure Power Generation System Page Page Page Radio Frequency Interference 990-1845C