American Power Conversion 250 A manual ATS monitoring unit

Page 27

ATS Component Details

ATS monitoring unit

This port connects to the Source 2 volt-sensing circuit

 

board, the Source 1 volt-sensing circuit board, the

 

Source 1 current transformers, and the distribution

8 8 5- 22 8 8

panel volt-sensing circuit board.

 

This port connects to the ATS interface circuit board.

The display port (RJ-45) connects the monitoring unit

to the display interface.

The power LED indicates whether the monitoring unit

 

 

 

 

 

 

is receiving power.

 

 

 

 

 

 

The console port (DB-9) is used to configure items

 

 

 

1

4

 

relating to servicing and for communication with the

 

 

 

1

 

generator (see item 4 on page page 13).

 

 

2

 

 

 

 

 

1 5

 

 

 

3

 

 

 

 

 

6

 

 

 

 

4

1

 

 

 

 

 

 

 

 

 

1 7

 

 

 

5

 

 

 

 

 

6

1 8

NOTE: A laptop computer can be connected to this

 

 

 

 

 

 

 

 

 

1

 

 

 

 

7

 

 

 

 

 

8

2 0

 

 

 

 

 

 

 

 

 

 

2 1

 

 

 

LIN K RX/TX

2 1 1 1 0 9

2 4 2 3 2 2

 

port for configurations.

 

 

 

 

 

 

 

1

2 5

 

The EPO DIP switches configure the EPO input for

 

N E T O R K

1 0 = G R N 1 0 0 = O R N

 

 

1 3

 

 

 

 

the type of EPO switch that is connected: Normally

 

 

 

 

 

 

 

 

 

 

R E T

STATU S

IS PL A Y

 

Open (NO) or Normally Closed (NC).

TR

 

 

 

D

 

 

When the EPO Arm/Test rocker is in the Test

 

 

R

 

 

 

 

PO E

position, engaging the EPO switch will not cause the

 

A RM ED

 

 

 

 

 

load to be shut down. When the rocker is in the Armed

EPO

 

R S-2 3 2 C O N S O LE PO R T

9 6 00 -8 N -1

 

TE ST

position, engaging the EPO switch turns OFF the ATS

 

 

 

 

N C

 

Source 1 and Source 2 switches and engages the

 

 

N O

 

 

 

generator’s emergency stop button. When the EPO

 

 

 

 

 

 

switch is engaged, the Not in Automatic LED on the ATS is lit (see page 64 for more information about testing the EPO switch).

The EPO Armed LED is lit green when the rocker is in the Armed position. The LED is dark when

the rocker is in the Test position.

The EPO Tripped LED is lit red when the EPO switch is engaged (the EPO button is pressed), regardless of the state of the EPO Arm/Test rocker.

The reset button resets the network processor; it does not reset the ATS or the monitoring unit.

The network port connects to the surge-protected ethernet port on the user connection plate (see page 16 for more information about the surge-protected ethernet port).

This port connects to the ATS interface circuit board.

The optional User/EPO Contacts port is connected to the user interface board on the user connection plate attached to the roof of the ATS. This port supports relay outputs (4), input contacts (4), and one

EPO input (see page 16 for more information).

InfraStruXure Power Generation System

17

Image 27
Contents Operation Page Companion manuals How to find updates to this manualAbout This Manual AudiencePage Contents Display Interface Communication Configuration Customizing and Updating the ATS Specifications Page Safety symbols used in this manual Cross-reference symbols used in this manualOverview Wire sizing Installation Total power off procedureOperating environment Page Overview InfraStruXure Power Generation SystemSystem Operates How the InfraStruXure Power GenerationGenerator cool-down Generator start sequenceOpen and closed transfers Fuel monitoring/runtime calculation Page Front view, door closed Smart Distribution Panel with ATS The automatic operation Control panel is used to set Front view, door openATS panel board, left side Installation Manual for instructionsATS panel board, right side ATS Component Details Motorized switchesUser connection plate Automatic operation control panelATS monitoring unit  When the EPO Arm/Test rocker is in the TestATS label kit Automatic Operation OperationAutomatic Operation Problem-loss of automatic operation Emergency Manual Operation Set the ATS Automatic Operation switch to Disable How to power the load from the generatorEmergency Manual Operation How to return to powering the load from utility Press Total Power Off Total Power Off Display Interface Top-level menu screen Top-level status screensNavigating through screens Password-protected screensTotal Load Summary Total Load by PhasePower Factor Load-MeterATS/Voltage ATS PositionS1-Utility S2-Generator ATS Setup ATS/Voltage Generator Status GeneratorOperating Settings Gen Output AdjustManufacturer Data Testing View Test LogRun/View Test Test Duration Test ScheduleHow a test occurs Reset Reset AllStats Alarm Setup AlarmsView Active Alarms Alarm/Event LogOther Limits Alarm BeeperClearing latched alarms Fuel Alarm LimitsDate/Time ConfigSystem Password System/NetworkPage Reset 100% Fuel Level Electrical ConfigFactory Defaults Firmware UpdatesPage Network management interfaces ATS Management OptionsOverview InfraStruXure ManagerConnect the ATS to the InfraStruXure Manager Configuring the InfraStruXure ManagerConnect the ATS to your network Configuring the ATS Network Management InterfaceConfiguration overview TCP/IP configuration methodsDevice IP Configuration Wizard Bootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Remote access to the control console Local access to the control consoleChoose Network from the Control Console menu Control consoleWeb interface How to Access the ATS Network Management InterfaceSnmp Telnet and SSHFTP and SCP InfraStruXure Power Generation System Customizing and Updating the ATS How to connect contacts to the user interface board EPO Test NC no How to Connect an EPO Switch to the ATSContact Closure-Normally Open Problem Action Safety warnings How to Allow Easy Access to the ATS Display Interface Part Number Description Height on Panel Output distribution circuit breakers available from APCCircuit breaker adapter modules available from APC Determine the configuration of the panelCombination #1 Allowed circuit breaker combinationsCombination #6 T1 three-pole breaker requires no additional preparation Preparing the breakers for installationT1 three-pole breaker assembly Parts and tools needed for installation proceduresInstalling breakers on the ATS panel bus See also From a local computer How to Download Firmware UpdatesPhysical ElectricalAWG Installation and Wiring 208V 480VCompliance EnvironmentalPage If Source 2 is a Second Utility Appendix Custom InstallationsInfraStruXure Power Generation System Index InfraStruXure Power Generation System InfraStruXure Power Generation System Page Page Page Radio Frequency Interference 990-1845C