Operation
Automatic Operation
How to place the InfraStruXure Power Generation System in automatic operation
1.Ensure utility power is available. If the utility is not available, the ATS will signal the generator to start.
2.Ensure the /Manual/Auto switch on the generator control panel is in the Auto position.
3. Set the ATS Automatic Operation switch to Enable.
4.Ensure the Not In Automatic Operation LED is unlit (see page 21 for information about uncommon behavior of this LED).
“How the InfraStruXure Power Generation System Operates” on page 6 summarizes automatic operation of the InfraStruXure Power Generation System.
InfraStruXure Power Generation System | 19 |