How to Connect an EPO Switch to the ATS

Connect an EPO switch to the user interface board and test the switch

1.Connect the switch to the EPO connection terminals on the user interface board. Read the label next to the terminal block to determine which terminals correspond to your signal type:

Contact Closure—Normally Open

USER INTERFACE

© 2001 APC

MADE IN USA

1

2

3

4

 

Contact Inputs

 

Contact Outputs

ATS 0 ATS 1 ATS 2

External set of Normally Open

Voltage-free Contacts

EN

– +

 

ATS

EPO 24V

EPO

AC/DC

Contact

– Contact Closure—Normally Closed

USER INTERFACE

© 2001 APC

MADE IN USA

1

2

3

4

 

Contact Inputs

 

Contact Outputs

External set of Normally Open

Voltage-free Contacts

ATS0 ATS1 ATS2

ATSEN

– +

Contact

AC/DC

 

 

EPO 24V

EPO

24VAC/VDC—Normally Open

USER INTERFACE

© 2001 APC

MADE IN USA

1

2

3

4

 

 

Contact Outputs

 

 

Contact Inputs

 

 

 

 

External set of

Normally Open Voltage-free Contacts

24 VAC or 24 VDC Power Supply

ATS0 ATS1 ATS2

ATSEN

– +

Contact

AC/DC

 

 

EPO 24V

EPO

2.Verify that the EPO DIP switches on the ATS monitoring unit are configured properly for your signal type. The labels above the switches and the figure below show the correct settings for both the Normally Open (NO) and Normally Closed (NC) configurations.

Location of switches on ATS monitoring unit

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

64

InfraStruXure Power Generation System

Image 74
Contents Operation Page Audience How to find updates to this manualAbout This Manual Companion manualsPage Contents Display Interface Communication Configuration Customizing and Updating the ATS Specifications Page Overview Safety symbols used in this manualCross-reference symbols used in this manual Wire sizing Operating environment InstallationTotal power off procedure Page InfraStruXure Power Generation System OverviewHow the InfraStruXure Power Generation System OperatesGenerator start sequence Generator cool-downOpen and closed transfers Fuel monitoring/runtime calculation Page Smart Distribution Panel with ATS Front view, door closedFront view, door open  The automatic operation Control panel is used to setInstallation Manual for instructions ATS panel board, left sideATS panel board, right side Motorized switches ATS Component DetailsAutomatic operation control panel User connection plate When the EPO Arm/Test rocker is in the Test ATS monitoring unitATS label kit Operation Automatic OperationAutomatic Operation Problem-loss of automatic operation Emergency Manual Operation How to power the load from the generator Set the ATS Automatic Operation switch to DisableEmergency Manual Operation How to return to powering the load from utility Press Total Power Off Total Power Off Display Interface Top-level status screens Top-level menu screenPassword-protected screens Navigating through screensLoad-Meter Total Load by PhasePower Factor Total Load SummaryS1-Utility ATS/VoltageATS Position S2-Generator ATS Setup ATS/Voltage Generator Generator StatusManufacturer Data Operating SettingsGen Output Adjust Run/View Test TestingView Test Log Test Schedule Test DurationHow a test occurs Stats ResetReset All Alarm/Event Log AlarmsView Active Alarms Alarm SetupFuel Alarm Limits Alarm BeeperClearing latched alarms Other LimitsSystem/Network ConfigSystem Password Date/TimePage Firmware Updates Electrical ConfigFactory Defaults Reset 100% Fuel LevelPage InfraStruXure Manager ATS Management OptionsOverview Network management interfacesConfiguring the InfraStruXure Manager Connect the ATS to the InfraStruXure ManagerConfiguring the ATS Network Management Interface Connect the ATS to your networkDevice IP Configuration Wizard Configuration overviewTCP/IP configuration methods Bootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Local access to the control console Remote access to the control consoleControl console Choose Network from the Control Console menuHow to Access the ATS Network Management Interface Web interfaceTelnet and SSH SnmpFTP and SCP InfraStruXure Power Generation System Customizing and Updating the ATS How to connect contacts to the user interface board How to Connect an EPO Switch to the ATS EPO Test NC noContact Closure-Normally Open Problem Action Safety warnings How to Allow Easy Access to the ATS Display Interface Output distribution circuit breakers available from APC Part Number Description Height on PanelDetermine the configuration of the panel Circuit breaker adapter modules available from APCAllowed circuit breaker combinations Combination #1Combination #6 Preparing the breakers for installation T1 three-pole breaker requires no additional preparationParts and tools needed for installation procedures T1 three-pole breaker assemblyInstalling breakers on the ATS panel bus See also How to Download Firmware Updates From a local computerElectrical PhysicalInstallation and Wiring 208V 480V AWGEnvironmental CompliancePage Appendix Custom Installations If Source 2 is a Second UtilityInfraStruXure Power Generation System Index InfraStruXure Power Generation System InfraStruXure Power Generation System Page Page Page Radio Frequency Interference 990-1845C