Config

System/Network

Contacts & Relays

Sub-Feed Config.

Electrical Config.

Factory Defaults

Manufacturer Data

System ID

Firmware Updates

System/Network

This menu consists of the following items:

System Password

Password: You can change the system password required to access protected

 

screens and fields in the display interface. Enter a string of up to eight

 

alphanumeric characters, and then add the underline character (_) to indicate the

 

end of the string. The default password is apc.

 

Timeout: Set the time the display interface will wait for user input before it

 

reverts to the initial scrolling of status screens. Select 1, 2, 5, 10 (the default), or

 

30 minutes; or 1, 2, or 4 hours; or forever.

 

Invalidate NOW: Allows you to re-enter your system password for viewing

 

password-protected screens.

Date/Time

Date: Set using the following format: dd-mmm yyyy.

 

Time: Set using the following format: hh:mm:ss

Local Interface

Contrast: Set the screen contrast for the LCD. Select from 1 (high contrast) to 8

 

(low contrast).

 

Key Click: Choose On for an audible click whenever you press a navigation

 

button. Choose Off to disable the click.

 

Beeper Volume: Select High, Medium, Low, or Off to adjust the loudness of

 

both the audible beeper and the click.

 

Metric Units: Choose On to view all data as metric values (e.g., meters) and Off

 

to view data as U.S. standard units (e.g., feet).

Network Config IP: The system IP address.

SM: The subnet mask, which identifies the subnetwork on which the ATS operates.

GW: The default gateway used by the ATS. The MAC address is displayed in brackets at the bottom of the screen.

InfraStruXure Power Generation System

45

Image 55
Contents Operation Page Companion manuals How to find updates to this manualAbout This Manual AudiencePage Contents Display Interface Communication Configuration Customizing and Updating the ATS Specifications Page Cross-reference symbols used in this manual Safety symbols used in this manualOverview Wire sizing Total power off procedure InstallationOperating environment Page Overview InfraStruXure Power Generation SystemSystem Operates How the InfraStruXure Power GenerationGenerator cool-down Generator start sequenceOpen and closed transfers Fuel monitoring/runtime calculation Page Front view, door closed Smart Distribution Panel with ATS The automatic operation Control panel is used to set Front view, door openATS panel board, left side Installation Manual for instructionsATS panel board, right side ATS Component Details Motorized switchesUser connection plate Automatic operation control panelATS monitoring unit  When the EPO Arm/Test rocker is in the TestATS label kit Automatic Operation OperationAutomatic Operation Problem-loss of automatic operation Emergency Manual Operation Set the ATS Automatic Operation switch to Disable How to power the load from the generatorEmergency Manual Operation How to return to powering the load from utility Press Total Power Off Total Power Off Display Interface Top-level menu screen Top-level status screensNavigating through screens Password-protected screensTotal Load Summary Total Load by PhasePower Factor Load-MeterATS Position ATS/VoltageS1-Utility S2-Generator ATS Setup ATS/Voltage Generator Status GeneratorGen Output Adjust Operating SettingsManufacturer Data View Test Log TestingRun/View Test Test Duration Test ScheduleHow a test occurs Reset All ResetStats Alarm Setup AlarmsView Active Alarms Alarm/Event LogOther Limits Alarm BeeperClearing latched alarms Fuel Alarm LimitsDate/Time ConfigSystem Password System/NetworkPage Reset 100% Fuel Level Electrical ConfigFactory Defaults Firmware UpdatesPage Network management interfaces ATS Management OptionsOverview InfraStruXure ManagerConnect the ATS to the InfraStruXure Manager Configuring the InfraStruXure ManagerConnect the ATS to your network Configuring the ATS Network Management InterfaceTCP/IP configuration methods Configuration overviewDevice IP Configuration Wizard Bootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where Remote access to the control console Local access to the control consoleChoose Network from the Control Console menu Control consoleWeb interface How to Access the ATS Network Management InterfaceSnmp Telnet and SSHFTP and SCP InfraStruXure Power Generation System Customizing and Updating the ATS How to connect contacts to the user interface board EPO Test NC no How to Connect an EPO Switch to the ATSContact Closure-Normally Open Problem Action Safety warnings How to Allow Easy Access to the ATS Display Interface Part Number Description Height on Panel Output distribution circuit breakers available from APCCircuit breaker adapter modules available from APC Determine the configuration of the panelCombination #1 Allowed circuit breaker combinationsCombination #6 T1 three-pole breaker requires no additional preparation Preparing the breakers for installationT1 three-pole breaker assembly Parts and tools needed for installation proceduresInstalling breakers on the ATS panel bus See also From a local computer How to Download Firmware UpdatesPhysical ElectricalAWG Installation and Wiring 208V 480VCompliance EnvironmentalPage If Source 2 is a Second Utility Appendix Custom InstallationsInfraStruXure Power Generation System Index InfraStruXure Power Generation System InfraStruXure Power Generation System Page Page Page Radio Frequency Interference 990-1845C